| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC ADP ROAD CHRISTIAN PATTY NAGAON P O P S NAGAON DIST NAGAON ASSAM | NAGAON | ASSAM | 782001 | ₹1.0 Cr | L1 | Accepted-AOC AOC given |
| Sl No | Description | Qty | Unit | AFTAB UDDIN AHMED L1 |
|---|---|---|---|---|
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
(B) Mechanical Means
(II) With dewatering
(ii) Depth 3 m to 6m
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 404.41 | CUM | 92.66 ₹37,472.63 |
| 2.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
A With crushed Stone
ii. PCC Grade M 15
Nominal mix (1:2.5:5)
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 7.31 | CUM | 5,894.19 ₹43,074.74 |
| 3.00 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
I. Without plasticiser
H. RCC Grade M35
(ii) Using Batching Plant, Transit Mixer and Concrete Pump
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 89.25 | CUM | 8,604.95 ₹7.7 L |
| 4.00 | Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202
Abutment Foundation
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 8.28 | MT | 63,550.07 ₹5.3 L |
| 5.00 | Plain/Reinforced cement concrete in sub structure complete as per drawing and technical specification and steel shuttering formwork
(N) Without plasticiser
H. RCC Grade M35
a. Height upto 5m
Case II. With Batching Plant, Transit Mixer and Concrete Pump
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 73.97 | CUM | 9,218.54 ₹6.8 L |
| 6.00 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.
(N) Without Plasticiser
E PSC Grade M40
Case ii. Using Batching Plant, Transit Mixer and Concrete Pump
(i) For Solid slab super structure
a. Height upto 5m
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 2.82 | CUM | 9,899.93 ₹27,878.20 |
| 7.00 | Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Abutment , Abutment Cap,Dirt walls, Pier, Pier cap, Pedestals, Sesmic arrestor, Riding return walls, U return wall / Fly Return walls
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 16.55 | MT | 70,000 ₹11.6 L |
| 8.00 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 45.59 | CUM | 1,498.38 ₹68,303.65 |
| 9.00 | Rebound Hammer test
Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format.
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 4 | NOS | 565.57 ₹2,262.28 |
| 10.00 | Ultrasonic pulse velocity test
Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department
Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15) | 4 | NOS | 735.23 ₹2,940.92 |
Tender Value
₹96.1 L
EMD Value
₹1.9 L
Closing Date
17 Dec 2025, 2:00 pmClosed
O/o The Chief Engineer (EAP), PWRD, Fatasil Ambari
O/o Chief Engineer (EAP), PWRD, Fatasil Ambari, Ghy-781025, Assam
CE/EAP/ARRBP/OCB/Bridge1/Dima Hasao/14 Construction of Bridge in Dima Hasao District i) Br.No. on SS Road to Moti Hojai via Riam Bathari village
2025_PWD_48989_10
ARRBP/BR/01/2024/E696387/45
Open Tender
Civil Works - Bridges
360 days
Dima Hasao
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
₹1.9 L
Yes
O/o The Chief Engineer (EAP), PWRD, Fatasil Ambari
28 Apr 2026
3 Dec 2025
17 Dec 2025
3 Dec 2025
17 Dec 2025
3 Dec 2025
3 Dec 2025 - 12 Dec 2025
12 Dec 2025
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (ii) Depth 3 m to 6m Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A With crushed Stone ii. PCC Grade M 15 Nominal mix (1:2.5:5) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. I. Without plasticiser H. RCC Grade M35 (ii) Using Batching Plant, Transit Mixer and Concrete Pump Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Abutment Foundation Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Plain/Reinforced cement concrete in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) Without plasticiser H. RCC Grade M35 a. Height upto 5m Case II. With Batching Plant, Transit Mixer and Concrete Pump Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser E PSC Grade M40 Case ii. Using Batching Plant, Transit Mixer and Concrete Pump (i) For Solid slab super structure a. Height upto 5m Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Abutment , Abutment Cap,Dirt walls, Pier, Pier cap, Pedestals, Sesmic arrestor, Riding return walls, U return wall / Fly Return walls Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser D RCC/PSC Grade M35 Case ii. Using Batching Plant, Transit Mixer and Concrete Pump (ii) For T-beam and Slab a. Height upto 5m Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawings and technical specification Clauses 1002, 1010 & 1202 RCC Girder, End Diaphragm, Deck slab Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainlesssteel matting surfaces, complete assembly to be of cast steel/fabricated structural steel, meatal and elastomer elements to be as per IRC:83 part-I &II respectively and parts conforming to BS:5400, section 9.1 & 9.2 and clause 2006 of MORTH&S Specification complete as per drawing and approved technical specification. FIX ,FREE, LONG, TRANS 60 MT Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Strip Seal Expansion Joint : (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and fixing drainage spouts as per MORT & H specifications. Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 300 mm Filter Media Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (ii) By Mechanical Means (a) In area of non-thorny jungle Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Manual Means Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge Block/ Edge Restraints Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or asdirected by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous / concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702 Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year. Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
Training related to Capacity Building Br. on SS Road to Moti Hojai via Riam Bathari village (Span 1 x 15)
The Provisional Sum of Rs. 64,804 (Rupees Sixty Four Thousand Eight Hundred Four Only) is meant for utility shifting and tree felling/plantation. This is a fixed amount to be utilised during implementation for the purpose of utility shifting and tree felling/plantation. (Bidder is not required to quote the fixed amount separately.)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.26 MB
Drawings.pdf
Additional Documents • 7.35 MB
ESMP.pdf
Additional Documents • 1.72 MB
SBD.pdf
Tender Documents • 3.44 MB
LOF.pdf
Additional Documents • 0.61 MB
BOQ_77779.xls
BOQ • 0.29 MB
Technical_Specification.pdf
Additional Documents • 2.26 MB
LOT.pdf
Additional Documents • 0.61 MB
Annexure.pdf
Additional Documents • 0.67 MB
Download all tender documents and submit your bid