Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 Cr+₹17.8 L (5.78%)Rejected-Finance A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹3.3 Cr+₹17.8 L (5.78%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.5 Cr+₹39.1 L (12.7%)Rejected-Finance VILLAGE NUSRATABAD KHARKHADI POST LONI DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹3.5 Cr+₹39.1 L (12.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.5 Cr+₹41.7 L (13.5%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.5 Cr+₹41.7 L (13.5%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | M/S YOGESH KUMAR SHARMA L3 | M/S PRADEEP ASSOCIATES L2 | GOMATINETRA CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | E/W in foundation in dry ordinary soil including lift upto1.5 meter And lead up to 30 m and including back filling watering and ramming of exacavated earth into the spce between the structure as Directed by the Engineer-in- Charge | 985.54 | Cum | 100 ₹98,554 | 50 ₹49,277 Lowest | 80 ₹78,843.2 | 90 ₹88,698.6 |
| 2.00 | Treatment of existing masonry using chemical emulsion Including All cost of material labour and T&P etc. Complet for proper completion of work. | 456.31 | Rm | 35 ₹15,970.85 Lowest | 40 ₹18,252.4 | 40 ₹18,252.4 | 52 ₹23,728.12 |
| 3.00 | Providing and laying C.C. 1:2:4 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete for proper completion of work. | 265.61 | Cum | 5,000 ₹13,28,050 | 5,500 ₹14,60,855 | 5,000 ₹13,28,050 | 4,800 ₹12,74,928 Lowest |
| 4.00 | Brick work in Class-150 bricks in 1:6 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 1,917.77 | Cum | 4,200 ₹80,54,634 Lowest | 4,400 ₹84,38,188 | 4,500 ₹86,29,965 | 5,000 ₹95,88,850 |
| 5.00 | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 182.4 | Cum | 4,600 ₹8,39,040 | 4,700 ₹8,57,280 | 4,500 ₹8,20,800 Lowest | 5,000 ₹9,12,000 |
| 6.00 | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 8.42 | Cum | 3,500 ₹29,470 | 3,484 ₹29,335.28 | 3,000 ₹25,260 Lowest | 3,800 ₹31,996 |
| 7.00 | Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.. | 3,084.35 | Cum | 30 ₹92,530.5 Lowest | 100 ₹3,08,435 | 140 ₹4,31,809 | 120 ₹3,70,122 |
| 8.00 | Providing and laying D.P.C. 40 mm thick with cement concrete consisting of( 1:2:4) cement , Coarse sand and 10mm grade stone grit and including water proofing material as directed by the Engineer-In -Charge in the proportion as specified by the manufacturer. | 135.99 | sqm | 200 ₹27,198 Lowest | 213 ₹28,965.87 | 200 ₹27,198 Lowest | 200 ₹27,198 Lowest |
| 9.00 | Centering and fine ply wood or steel shuttering for R C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 3,105.97 | sqm | 450 ₹13,97,686.5 Lowest | 720 ₹22,36,298.4 | 600 ₹18,63,582 | 700 ₹21,74,179 |
| 10.00 | Centering and shuttering for C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 370.8 | sqm | 450 ₹1,66,860 | 516 ₹1,91,332.8 | 420 ₹1,55,736 | 400 ₹1,48,320 Lowest |
Tender Value
₹4.0 Cr
EMD Value
₹8.1 L
Closing Date
1 Jun 2026, 1:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works, 139, Mall Road, Pratappura, Agra
Construction of Type-I and Type-II class houses for the residence of employees working in the Sub-Division-IIIrd Palwal (Haryana) under Upper Division, Agra Canal, Mathura.
2026_UPIDC_1152274_1
04/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Palwal Haryana
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,810
₹8.1 L
Office of The SE 3rd Circle Irrigation Works, Agra
19 Sept 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in foundation in dry ordinary soil including lift upto1.5 meter And lead up to 30 m and including back filling watering and ramming of exacavated earth into the spce between the structure as Directed by the Engineer-in- Charge | 985.54 | Cum | - | - |
| - | Treatment of existing masonry using chemical emulsion Including All cost of material labour and T&P etc. Complet for proper completion of work. | 456.31 | Rm | - | - |
| - | Providing and laying C.C. 1:2:4 with cement, Coarse sand and stone grit (20-40 mm size) including cost of all material, labour and T&P etc.complete for proper completion of work. | 265.61 | Cum | - | - |
| - | Brick work in Class-150 bricks in 1:6 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 1,917.77 | Cum | - | - |
| - | Brick work in Class-150 in 115mm Thick Wall in 1:4 cement and coarse sand mortar including supply of all material Labour, T&P etc. | 182.4 | Cum | - | - |
| - | Dry Brick work in Class 150 including supply of all material Labour, T&P etc. | 8.42 | Cum | - | - |
| - | Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.. | 3,084.35 | Cum | - | - |
| - | Providing and laying D.P.C. 40 mm thick with cement concrete consisting of( 1:2:4) cement , Coarse sand and 10mm grade stone grit and including water proofing material as directed by the Engineer-In -Charge in the proportion as specified by the manufacturer. | 135.99 | sqm | - | - |
| - | Centering and fine ply wood or steel shuttering for R C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 3,105.97 | sqm | - | - |
| - | Centering and shuttering for C C Work including supply of all material Labour, T&P etc (Complete language for all heights.) | 370.8 | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_2158599.xls
BOQ • 0.36 MB
TechnicalPalwalBuilding.pdf
Tender Documents • 2.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .