Loading…
Loading…
Updated dates
Tender Value
₹1.7 Cr
EMD Value
₹2.5 L
Closing Date
13 Jun 2026, 6:00 pm
HQ CE Jodhpur Zone
Chief Enginner Jodhpur Zone
INCLUSION OF EXISTING SMART METERS IN THE SCHEME AND REPLACEMENT OF EXISTING ENERGY METERS WITH SMART ELECTRIC METERS AT MOUNT ABU MIL STN AND UDAIPUR MIL STN
2026_MES_764732_1
800649/UDR/E8
Open Tender
Electrical and Maintenance Works
426 days
Udaipur and Mt Abu
Yes as per NIT
8 documents required · 8 mandatory
₹1,000
AGE (I) Udaipur
₹2.5 L
Yes
12 May 2026
12 May 2026
20 Jun 2026
12 May 2026
13 Jun 2026
6 Jun 2026
13 May 2026 - 20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down carefully old Unserviceable energy meters carefully by disconnecting and unscruing/removing from boards/ outlet boxes, of any size, rating, at any location, noting down the meter reading building wise including photographic record of the meter reading depositing to AGE E/M store duly marked house number and last meter reading with permanent marker as per building inventory, making good the disturbed surface as per existng specifications, complete all as specified and as directed. (102 number of meters in Mount Abu Mil Station and 667 number of meters in Udaipur Mil Station) | 769 | Each Job | - | - |
| 2 | Survey, Design,Supply, installation , commissioning, integration and testing of the advanced metering infrastructure (AMI) including procurement of all necessary hardware,software,programming licenses for each station (One for Mount Abu and one for the Udaipur), comprising following : | 1 | Each Job | - | - |
| 2.01 | To perform (carryout) site survey and decide the communication technology and design advanced metering infrastructure system to ensure seamless communication and operation of complete AMI, smart meter system and data availability to all cosumers. The communication technology selected and decided may be cellular(3G/4G/5G)/RF Mess network or combination(Hybrid) of cellular (3G/4G/5G) and RF mess or any other advanced technology as per CEA/TRAI guidelines.
NOTE for 2.00 and 2.01 of BOQ item : Complete Survey report with proposed AMI technology to be provided , shall be submitted by the contractor to the engineer-in-charge and after getting it approved from GE, report shall be submitted to Nodal Officer(Rep of Accepting Officer) for approval in consultation with user. Irrespective of approval of Nodal Officer, Contractor shall be fully responsible for proper design,execution and smooth functioning of AMI infrastructure. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
tender.pdf
Tender Documents • 2.02 MB
BOQ_856552.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid