Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.2 L
EMD Value
₹2.1 L
Closing Date
12 Jan 2026, 12:00 pmClosed
Executive Officer
NPP Shikarpur
Interlocking work
2025_DOLBU_1103139_4
1680,dt 26.12.2025
Open Tender
Civil Works
60 days
npp shikarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Officer NPP Shikarpur
₹2.1 L
27 Jan 2026
31 Dec 2025
12 Jan 2026
31 Dec 2025
12 Jan 2026
31 Dec 2025
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per directionof Engineer - in - charge.As per DSR 2023 15.1
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. As per DSR 2023 2.25(a)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).As per DSR 2023 4.1.8
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)As per DSR 2023 6.1.1
12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand). As per DSR 2023 13.4.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : CC 1:2:4 As per DSR 2023 4.1.3
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)As per DSR 2023 5.1.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.As per DSR 2023 5.22A.6
Construction of granular sub-base by providing …………... and compacting with smooth wheel roller …...complete as per Technical Specificationin clause 401 .
Supply and laying 80mm thick cement inter locking tiles with 4cm. Cushin fine sand layer all material, labour and T&P etc. comp. work.
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2034269.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid