Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.2 LAccepted-Finance | ₹80.2 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Due to not submission of desired document as per point no. 06 (History of non performing contracts) of BID Document. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to not submission of desired document as per point no. 06 (History of non performing contracts) and 07 (Declaration by Bidder) of BID Document |
Tender Value
₹83.8 L
EMD Value
₹1.7 L
Closing Date
13 Jul 2026, 6:00 pmClosed
SE
SE Water Resources Circle Udaipur
Construction of Approach Road to Kanthariya Dam Tehsil Jhadol, District Udaipur.Construction of Approach Road to Kanthariya Dam Tehsil Jhadol, District Udaipur.
2026_WRDAS_572593_1
SE/01/2026-27
Open Tender
Civil Works
Percentage
udaipur
As mentioned in Bid Documents.
3 documents required · 3 mandatory
₹1,000
Secretary, RREIS
₹1.7 L
Yes
12 Aug 2026
2 Jul 2026
14 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle, bushes, shrubs, Ankra / Ipomoea, Julicflora typna etc. on canal and bunds in dry /moist /slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. ordinary | 9,200 | SQM | 1.45 | ₹13,340 |
| 2 | Excavation including loading, unloading disposal and dressing of excavated earth within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.Hard soil mixed with kanker /boulders ,morrum | 168.2 | CUM | 119 | ₹20,015.8 |
| 3 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.(a) Soft / desintegrated rock | 197.2 | CUM | 161 | ₹31,749.2 |
| 4 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.(b) Hard rock not requiring blasting | 126.8 | CUM | 242 | ₹30,685.6 |
| 5 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.(c) Phylite & other hard rock requiring nominal blasting | 170.8 | CUM | 346 | ₹59,096.8 |
| 6 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated | 44 | CUM | 467 | ₹20,548 |
| 7 | preparation of foundation of structure including removal of all loose stones , silt and final washing (a) By manual labours | 1,980 | SQM | 23 | ₹45,540 |
| 8 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm | 180.9 | CUM | 4,975 | ₹8,99,977.5 |
| 9 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 420 kg/ cum of concrete) Up to 20 mm. | 91 | CUM | 6,433 | ₹5,85,403 |
| 10 | Add Extra for RCC work for Retaining wall, wing wall, returns, divide wall, Pier, | 91 | CUM | 190 | ₹17,290 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
KANTHARIYATD.pdf
Tender Documents • 2.58 MB
BOQ_1018586.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].