Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹71,462.22Admitted-Fee/PreQual/Technical/Finance | -27.60% | ₹71,462.22 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹98,013.79+₹26,551.57 (37.2%)Admitted-Fee/PreQual/Technical/Finance | -0.70% | ₹98,013.79+₹26,551.57 (37.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 L+₹29,216.59 (40.9%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹1.0 L+₹29,216.59 (40.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98,000
EMD Value
₹2,940
Closing Date
7 Sept 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
C/O Well NLO Mahtaba Begum AND others w-1
2026_RDPR_322821_1
NIT NO 105 OF 2026-27 ADF FRESH GEN
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹2,940
13 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: | 43.5 | cum | 479.3 | ₹20,849.55 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material, 1 All kinds of soil : | 26.12 | cum | 89.75 | ₹2,344.27 |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth with bond stone (Nallah) | 17.09 | cum | 2,700 | ₹46,143 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size): including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | 1.03 | cum | 7,788.4 | ₹8,022.05 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete | 93.24 | qtls | 115 | ₹10,722.6 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for,Suspended floors, roofs, landings, balconies and access platforms. | 3.9 | cum | 718.2 | ₹2,800.98 |
| 7 | a) Stone aggregate from an avg. lead of 20 Km | 1.03 | cum | 409.94 | ₹422.24 |
| 8 | c) Carriage of stones for an avg. lead of 15 Km | 17.09 | cum | 374.49 | ₹6,400.03 |
| 26 | Add Provision for CIB & Photographs | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1084510.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .