| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹2.1 CrRejected-Finance | ₹2.1 Cr | L2 | Rejected-Finance QUOTED HIGHER AMOUNT THAN L1 |
| 3 | L3₹2.4 CrRejected-Finance 121004 | ₹2.4 Cr | L3 | Rejected-Finance QUOTED HIGHER AMOUNT THAN L1 |
| 4 | L4₹2.6 CrRejected-Finance 692 BAHRA SAUDAGAR NABI PURWA HARDOI UTTAR PRADESH | HARDOI | HARDOI | UTTAR PRADESH | ₹2.6 Cr | L4 | Rejected-Finance QUOTED HIGHER AMOUNT THAN L1 |
| Sl No | Description | Qty | Unit | M/S KUMAR MANGLAM CONSTRUCTION L3 | M/S JAMEEL CONTRACTOR L2 | NIRBHAY KUMAR MISHRA L4 | M/S RAGHVENDRA PRATAP SINGH L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and throney bushes without uprooting i/c labour and T&P as per direction by Engineer-in-charge | 81,920 | SQM | 3 ₹2,45,760 | 1.55 ₹1,26,976 Lowest | 7.26 ₹5,94,739.2 | 5 ₹4,09,600 |
| 2.00 | Earth work in silt clearence by Pocklane with proper disposal on the outer slope/ service road as requard etc for completion i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 1,09,430.03 | CUM | 22 ₹24,07,460.66 Lowest | 26 ₹28,45,180.78 | 43.12 ₹47,18,622.89 | 28 ₹30,64,040.84 |
| 3.00 | Earth works in excavation including lead uoto 30 meter and lift upto 1.5 meter excluding mechanical compaction but including manual compaction and dressing to profile (for cleaning silt on floor of Bridge and culverts) i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 240.35 | CUM | 132 ₹31,726.2 | 85 ₹20,429.75 | 116.16 ₹27,919.06 | 80 ₹19,228 Lowest |
| 4.00 | Dressing of excavated earth from silt clearance on the outer slope/ service road as requard etc for completion i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 1,09,670.37 | CUM | 2 ₹2,19,340.74 Lowest | 3 ₹3,29,011.11 | 8.8 ₹9,65,099.26 | 5 ₹5,48,351.85 |
| 5.00 | Demolish brick work manually / by mechanical means imcluding stacking of servicable material and disposal of unserviceable material within 50 meter lead as per direction by Engineer-in-charge. | 9.53 | CUM | 1,669 ₹15,905.57 | 1,120 ₹10,673.6 | 1,468.72 ₹13,996.9 | 700 ₹6,671 Lowest |
| 6.00 | Earth work in foundation for masonary work including all lead and lift and compection required for proper completion of the work as per direction by Engineer-in-charge. | 1,306.09 | CUM | 132 ₹1,72,403.88 | 55 ₹71,834.95 Lowest | 116.16 ₹1,51,715.41 | 70 ₹91,426.3 |
| 7.00 | Making sub grade in pitching work including watering compaction and preparation of surface. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. | 2,300 | SQM | 21 ₹48,300 | 15 ₹34,500 | 18.48 ₹42,504 | 10 ₹23,000 Lowest |
| 8.00 | supply and laying 200 micron LDPE film including cost of all labour & material T & P etc required for proper completion of work as per direction of Engineer-in-charge. | 5,499.5 | SQM | 42 ₹2,30,979 | 27 ₹1,48,486.5 | 36.96 ₹2,03,261.52 | 25 ₹1,37,487.5 Lowest |
| 9.00 | Cement concrete in 1:3:6 in foundation with course sand and stone grit 25-40 gauge including cost of all labour & material T & P etc required for proper completion of work | 698.61 | CUM | 8,600 ₹60,08,046 | 8,265 ₹57,74,011.65 | 8,776.03 ₹61,31,022.32 | 7,000 ₹48,90,270 Lowest |
| 10.00 | Supply , Fabrication and fixing of mild steel /iron work in Head Regulator Gate including cutting, drilling, welding/ riveting and hinges where necessary and fixing in position including cost of material, labour T&P etc. required for proper completion of work with one coat of red oxide primer (Overall) as per direction of Engineer-in-charge. | 18,733.96 | KG | 95 ₹17,79,726.2 | 79.65 ₹14,92,159.91 | 83.6 ₹15,66,159.06 | 75 ₹14,05,047 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
13 Jul 2026, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE SIX CIRCLE LUCKNOW
Janpad hardoi me Hardoi khand sharda nahar hardoi ke antargat Harrai scape ke km 0.000 ka 10.200 km tk kshatigrasht pakki sanrachnao ke punarnirman avam aantrik sudhar ka karya
2026_UPIDC_1166530_1
02/SE-6/2026-27
Open Tender
Civil Works
Item Rate
180 days
Hardoi
Please refer tender document
2 documents required · 2 mandatory
₹2,714
₹5.8 L
20 Aug 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and throney bushes without uprooting i/c labour and T&P as per direction by Engineer-in-charge | 81,920 | SQM | - | - |
| 2 | Earth work in silt clearence by Pocklane with proper disposal on the outer slope/ service road as requard etc for completion i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 1,09,430.03 | CUM | - | - |
| 3 | Earth works in excavation including lead uoto 30 meter and lift upto 1.5 meter excluding mechanical compaction but including manual compaction and dressing to profile (for cleaning silt on floor of Bridge and culverts) i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 240.35 | CUM | - | - |
| 4 | Dressing of excavated earth from silt clearance on the outer slope/ service road as requard etc for completion i/c initial lead and lift , labour and T&P as per direction by Engineer-in-charge. | 1,09,670.37 | CUM | - | - |
| 5 | Demolish brick work manually / by mechanical means imcluding stacking of servicable material and disposal of unserviceable material within 50 meter lead as per direction by Engineer-in-charge. | 9.53 | CUM | - | - |
| 6 | Earth work in foundation for masonary work including all lead and lift and compection required for proper completion of the work as per direction by Engineer-in-charge. | 1,306.09 | CUM | - | - |
| 7 | Making sub grade in pitching work including watering compaction and preparation of surface. Work shall be carried out as drawing provided and as per direction of Engineer-in-charge. | 2,300 | SQM | - | - |
| 8 | supply and laying 200 micron LDPE film including cost of all labour & material T & P etc required for proper completion of work as per direction of Engineer-in-charge. | 5,499.5 | SQM | - | - |
| 9 | Cement concrete in 1:3:6 in foundation with course sand and stone grit 25-40 gauge including cost of all labour & material T & P etc required for proper completion of work | 698.61 | CUM | - | - |
| 10 | Supply , Fabrication and fixing of mild steel /iron work in Head Regulator Gate including cutting, drilling, welding/ riveting and hinges where necessary and fixing in position including cost of material, labour T&P etc. required for proper completion of work with one coat of red oxide primer (Overall) as per direction of Engineer-in-charge. | 18,733.96 | KG | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.62 MB
BOQ_2188040.xls
BOQ • 0.35 MB
BIDDOCLOT01.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].