Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹22.9 L+₹2.0 L (9.81%)Rejected-Finance | L2 | Rejected-Finance Found 2nd Higher | |
| 3 | L3₹24.2 L+₹3.3 L (15.6%)Rejected-Finance 2 1433 D 6 KAMAL COLONY SAHARANPUR UP PIN 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L3 | Rejected-Finance Found 3rd Highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AMIT ENGINEERING CORPORATION L1 |
|---|---|---|---|---|
| 0.00THE WORK OF INSTALLATION OF FRP FENCING ON DISTRIBUTION TRANSFORMERS (250 KVA & ABOVE) IN THE AREA OF BANDA UNDER BUSINESS PLAN YEAR 2018-19 UNDER EUDD/EDD, BANDA, details of the work as given below :- | ||||
| 1.00 | Material required for laying cement concrete in volumetric proportion for PCC work at the all levels, heights, depths & in any size & any Shapes, using machine cut black hard stone metal of 12mm to 20mm as coarse aggregate including mixing in mixture machine and compacting the concrete with manually compactor with neccessary frame work, centering, shuttering, scaffolding, curring etc. complete as directed by site-incharge.(Rate to include making neccessary pocket, slits, holes, opening etc, for cable entries etc. frame form work of required shape and size) 1:4:8 | 20 | Plinth | 2,000 ₹40,000 Lowest |
| 2.00 | Material required for constructing bricks masonry in thickness of 230mm & above for fencing bricks should be tabel molded first class approved quality of bricks in 1:4 cement mortar (one part cement, four part coarse sand) for Structure with chauffeured our rounded-edges, corners, scaffoling, racking out joints. curing screening of sand through mesh of required size teething in the existing wall etc. complete as directed with the all lead, lifts, heights and levels. ( Rate to include making trenches in both size of DTC Plinth etc. in bricks work as directed by site-incharge) | 20 | Plinth | 10,500 ₹2,10,000 Lowest |
| 3.00 | Material Required for Laying 12 to 15 mm thick cement plaster to brick masory. All RCC work for all surface etc.in 1:3 cement mortar including Screening of sand through mesh of required size, surfaces curing etc Compelete. Rate to include cost of watering on existing surface, hacking of concrete surface devlling, providing & making patti, vata, chamfered of rounded edges, with ghissi drip molding, pattads, grooves,etc will all lead lift, hights and level in cement plaster as directed by site-in-charge etc. complete | 20 | Plinth | 2,000 ₹40,000 Lowest |
| 4.00 | Providing & fixing of FRP Fencing as per Drawing (Annexure-A) & Technical Specification (Annexure-B) for Distribution Transformers (250 KVA & Above) | 240 | Mtr. | 7,500 ₹18,00,000 Lowest |
Tender Value
₹22 L
EMD Value
₹44,000
Closing Date
27 Sept 2018, 12:00 pmClosed
CHIEF ENGINEER (DISTN), BANDA ZONE, BANDA
CHILLLA ROAD, INDIRA NAGAR, NEAR ESC, BANDA
INSTALLATION OF FRP FENCING UNDER EUDD/EDD, BANDA
2018_DVVNL_252974_1
11/CE(D)/BZ/DVVNL/2018-19
Open Tender
Electrical Works
Item Rate
180 days
BANDA
AS PER ANNEXURED
2 documents required · 2 mandatory
₹2,596
www.dvvnl.org
₹44,000
3 Jun 2019
21 Sept 2018
27 Sept 2018
21 Sept 2018
27 Sept 2018
21 Sept 2018
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .