| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAdmitted-Finance | ₹4.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹23.1 L (4.95%)Admitted-Finance | ₹4.9 Cr+₹23.1 L (4.95%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 Cr+₹29.9 L (6.42%)Admitted-Finance | ₹5.0 Cr+₹29.9 L (6.42%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Potsangbam Tomba Singh L3 | Thokchom Bimolata Devi L1 | ASEM NINGTHEMJAO SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00EARTHWORK | ||||||
| 2.00Earth work in excavation by mechanical means ( Hydraulic excavation)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5 m, as directed by the Engineer-in-charge. | ||||||
| 3.00 | All kinds of Soil | 300.46 | Cum | 540 ₹1,62,250.02 | 503 ₹1,51,132.89 Lowest | 531.11 ₹1,59,578.9 |
| 4.00 | Filling available excavated earth(excluding rock) in trenches, pinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidation each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m. | 155.09 | Cum | 230 ₹35,669.78 | 211 ₹32,723.15 Lowest | 223.22 ₹34,618.3 |
| 5.00 | Supplying and filling in plinth with sandy soil under floors including, watering, ramming consolidating and dressing complete. | 219.43 | Cum | 1,025 ₹2,24,917.8 | 972 ₹2,13,287.9 Lowest | 1,024.84 ₹2,24,882.69 |
| 6.00CONCRETE WORKS | ||||||
| 7.00Providing and laying cement concrete in foundation. Plinth excluding the cost of centering and shuttering - All work upto plinth level : | ||||||
| 8.00 | 1 : 4 : 8 ( 1 cement :4 c/sand : 8 graded stone aggregate. 40mm. nominal size). | 112.51 | Cum | 10,070 ₹11,32,995.84 | 9,621 ₹10,82,477.95 Lowest | 10,065.03 ₹11,32,436.66 |
| 9.00RCC WORKS | ||||||
| 10.00Providing and laying in position ready mixed plain cement concrete or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland/ Portland Slag cement, admixture in recommended proportions as per IS:9103 to accelerate / retard setting of concrete,to improve ductility and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of Engineer-in-charge; for the follwing grades of concrete. All work upto plinth level: | ||||||
Tender Value
₹5.0 Cr
EMD Value
₹9.9 L
Closing Date
9 Mar 2026, 12:00 pmClosed
Executive Engineer Engg.Cell(H-I) HandFW Dept.
Office of the Executive Engineer Engg.Cell(H-I) HandFW Dept.
Construction of District Non-Communicable Diseases(NCD) Block (GPlus2) Building, Chandel District, Manipur.
2026_HFW_3303_1
253/EE/H-1/ENGG.CELL/HFW/HFW/
Open Tender
Civil Works
Works
730 days
As Per Tender Document
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Acc No 100210016112809
₹9.9 L
10 Apr 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
9 Mar 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTHWORK | - | - | - | - |
| 2 | Earth work in excavation by mechanical means ( Hydraulic excavation)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5 m, as directed by the Engineer-in-charge. | - | - | - | - |
| 3 | All kinds of Soil | 300.46 | Cum | 1 | ₹300.46 |
| 4 | Filling available excavated earth(excluding rock) in trenches, pinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidation each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m. | 155.09 | Cum | 1 | ₹155.09 |
| 5 | Supplying and filling in plinth with sandy soil under floors including, watering, ramming consolidating and dressing complete. | 219.43 | Cum | 1 | ₹219.43 |
| 6 | CONCRETE WORKS | - | - | - | - |
| 7 | Providing and laying cement concrete in foundation. Plinth excluding the cost of centering and shuttering - All work upto plinth level : | - | - | - | - |
| 8 | 1 : 4 : 8 ( 1 cement :4 c/sand : 8 graded stone aggregate. 40mm. nominal size). | 112.51 | Cum | 1 | ₹112.51 |
| 9 | RCC WORKS | - | - | - | - |
| 10 | Providing and laying in position ready mixed plain cement concrete or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland/ Portland Slag cement, admixture in recommended proportions as per IS:9103 to accelerate / retard setting of concrete,to improve ductility and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of Engineer-in-charge; for the follwing grades of concrete. All work upto plinth level: | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.91 MB
BOQ_3587.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .