Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.1 L+₹18,134.35 (3.08%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.2 L+₹30,616.44 (5.20%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹7.8 L
EMD Value
₹15,680
Closing Date
13 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_317063_8
e-NIT No. 68 REW UDHAMPUR of 2026-27 Dated 21-07-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹15,680
31 Aug 2026
22 Jul 2026
14 Aug 2026
22 Jul 2026
13 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. in 1:1.5:3 mix | 14.54 | cum | 9,821.85 | ₹1,42,809.7 |
| 2 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts andstruts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.88 | cum | 9,395.2 | ₹64,638.98 |
| 3 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 857.05 | cum | 123.2 | ₹1,05,588.56 |
| 4 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar. For superstructure | 28.38 | cum | 9,027.2 | ₹2,56,191.94 |
| 5 | Cetring and shuttering including strutting, propping etc and removal of the formwork. For Columns, pillars, piers, abutments ,posts,struts. | 105.39 | cum | 742.55 | ₹78,257.34 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. For Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 104.14 | cum | 577.55 | ₹60,146.06 |
| 7 | Carriage of Sand 60km MT & 100M AT | 17.16 | cum | 1,040.7 | ₹17,858.41 |
| 8 | Carriage of Stone Aggregates 20km MT & 100M AT | 20.14 | cum | 654.3 | ₹13,177.6 |
| 9 | Carriage of bRICKS 85km MT & 100M AT | 13,479.18 | No. | 3.44 | ₹46,368.38 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1037220.xls
BOQ • 0.28 MB
ExtensionN.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .