Loading…
Loading…
Tender Value
₹84.6 L
EMD Value
₹1.7 L
Closing Date
3 Jul 2026, 6:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Er.Mohd Ashraf Khan
RnB Xen Office Doru
Construction of Boundary wall with Devri gate and Chowkidar Quarter at GDC verinag
2026_PWDJK_313332_1
NIT NO 16 DOORU/1016-21 Dt 23-06-2026
Open Tender
Civil Works
275 days
DOORU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
xen RNB Dooru
₹1.7 L
Yes
24 Jun 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Chowkidar Quarter | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 52.36 | Cum | 225.18 | ₹11,790.42 |
| 3 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. | 7.58 | Cum | 762.71 | ₹5,781.34 |
| 4 | P/ L in position cement concrete in 1:4:8(1 cement :4coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. | 6.4 | Cum | 5,110.17 | ₹32,705.09 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 36.65 | Cum | 191.47 | ₹7,017.38 |
| 6 | Reinforced cement concrete work in 1: 1.5 : 3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)excluding the cost of centering, shuttering, finishing and reinforcement but including carriage of all materials from approved sources upto site of work complete.( All works upto plinth level) | 9.66 | Cum | 7,369.49 | ₹71,189.27 |
| 7 | Reinforced cement concrete work in 1: 1.5 : 3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)excluding the cost of centering, shuttering, finishing and reinforcement but including carriage of all materials from approved sources upto site of work complete.( All works above plinth level upto level V) | 9.19 | Cum | 9,159.32 | ₹84,174.15 |
| 8 | Reinforcement for RCC work including straightening cutting, bending, placing in position and binding all complete (Thermo mechanically treated bars) including all carriages complete. | 2,073.32 | Kg | 108.01 | ₹2,23,939.29 |
| 9 | P/ L in position cement concrete in 1:3:6(1 cement :3coarse sand : 6 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. | 26.41 | Cum | 5,575.42 | ₹1,47,246.84 |
| 10 | Centering & shuttering including strutting, propping etc including removal of form work for Foundations,, footings, bases of columns ,ramp,steps etc. for mass concrete. | 127.68 | Sqm | 242.67 | ₹30,984.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1014026.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid