| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.4 LRejected-Finance | ₹3.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 LRejected-Finance | ₹3.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹3.7 LRejected-Finance | ₹3.7 L | L4 | Rejected-Finance L4 |
| 5 | L5₹4.1 LRejected-Finance TEACHERS COLONY BAHERI BAREILLY | BAHERI | BAREILLY | UTTAR PRADESH | ₹4.1 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S PARAS ENTERPRISES L2 | GANGWAR TRADERS L5 | JULFIKAR AHMAD L1 | JAI GURUDEV ENTERPRISES L3 | M/S HASNAIN AHMAD CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in drain in silt clearance including lift up to 1.5 M and lead up to 30 M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks | 6.2 | cum | 46.86 ₹290.53 | 240 ₹1,488 | 40.79 ₹252.90 | 5,000 ₹31,000 | 57 ₹353.40 |
| 2.00 | Providing & Laying coarse in filter including cost of material, labour, carriage, loading, unloading,stacking and T & P etc. | 12.15 | cum | 1,820.79 ₹22,122.60 | 2,000 ₹24,300 | 1,584.86 ₹19,256.05 | 900 ₹10,935 | 1,990 ₹24,178.50 |
| 3.00 | Providing & Laying shingle 12 to 20 mm size including cost of material, labour, carriage, loading, unloading, stacking and T & P etc. | 12.15 | cum | 1,867.65 ₹22,691.95 | 2,000 ₹24,300 | 1,625.65 ₹19,751.65 | 9,850 ₹1.2 L | 1,990 ₹24,178.50 |
| 4.00 | Providing & Relaying Dry Boulder Pitching with New Boulder including cost of Boulder labour T & P etc complete work. | 25.15 | cum | 1,605.52 ₹40,378.83 | 2,000 ₹50,300 | 1,397.48 ₹35,146.62 | 500 ₹12,575 | 410 ₹10,311.50 |
| 7.00 | Providing & Laying 300 mm dia R.C.C. hume pipe NP-3 class with collar including cost of material, labour, carriage, loading, unloading, and T & P etc. | 5 | RM | 1,221.2 ₹6,106 | 2,000 ₹10,000 | 1,062.96 ₹5,314.80 | 900 ₹4,500 | 2,180 ₹10,900 |
| 8.00 | Providing & Laying Fine sand in sand loading including cost of material, labour, carriage, loading, unloading,stacking and T & P etc | 101.75 | cum | 1,513.36 ₹1.5 L | 1,100 ₹1.1 L | 1,317.27 ₹1.3 L | 850 ₹86,487.50 | 1,780 ₹1.8 L |
| 9.00 | Providing & Laying of factory made 80 mm thick Inter locking cement concrete tiles(30 mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding /laying of interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material labour, T&P etc. required for proper completion of work. | 156.5 | sq.m | 627.8 ₹98,250.70 | 1,200 ₹1.9 L | 531.48 ₹83,176.62 | 600 ₹93,900 | 760 ₹1.2 L |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
9 Mar 2026, 3:00 pmClosed
Executive Engineer, I.D, Bareilly.
Executive Engineer, I.D, Bareilly.
Nanak sagar bandh ke Km 2.650 To Km 2.680 ke Madhya sipage drain ki punarsthapna tatha second Road ke Sameep Interlocking Tiles ka Karya.
2026_UPIDC_1120069_1
Notices No 07/EE/2025-26
Open Tender
Civil Works
15 days
NANAK SAGAR UTTARA KHAND
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹9,600
18 Apr 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
Earthwork in drain in silt clearance including lift up to 1.5 M and lead up to 30 M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks
Providing & Laying coarse in filter including cost of material, labour, carriage, loading, unloading,stacking and T & P etc.
Providing & Laying shingle 12 to 20 mm size including cost of material, labour, carriage, loading, unloading, stacking and T & P etc.
Providing & Relaying Dry Boulder Pitching with New Boulder including cost of Boulder labour T & P etc complete work.
Providing & Laying 300 mm dia R.C.C. hume pipe NP-3 class with collar including cost of material, labour, carriage, loading, unloading, and T & P etc.
Providing & Laying Fine sand in sand loading including cost of material, labour, carriage, loading, unloading,stacking and T & P etc
Providing & Laying of factory made 80 mm thick Inter locking cement concrete tiles(30 mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding /laying of interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material labour, T&P etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2083311.pdf
techsummary_2083311.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_2083311.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid