| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 CrAccepted-AOC | ₹16.1 Cr | L1 | Accepted-AOC Reason |
| 2 | L2₹16.9 CrRejected-Finance NULL | ₹16.9 Cr | L2 | Rejected-Finance unReasons |
| 3 | L3₹17.9 CrRejected-Finance | ₹17.9 Cr | L3 | Rejected-Finance unReasons |
| 4 | L4₹19.8 CrRejected-Finance S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | ₹19.8 Cr | L4 | Rejected-Finance unReasons |
| 5 | L5₹21.8 CrRejected-Finance | ₹21.8 Cr | L5 | Rejected-Finance unReasons |
| Sl No | Description | Qty | Unit | JAI SHAKTI CONSTRUCTION L8 | Raja Infraconstruction Pvt Ltd L5 | M/S JAGDISH SARAN L6 | Krishna Infratec L2 | SRS EXPRESS PRIVATE LIMITED L4 | SADHNA CONSTRUCTION L1 | M/S VIJAY KUMAR L3 | M/s AP & Associates L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. By Mechanical Means using Hydraulic excavator as per MORT&H clause 3.15 305.4.3 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 6,900 | Sqm | 8.9 ₹61,410 | 8 ₹55,200 | 10 ₹69,000 | 2 ₹13,800 | 4 ₹27,600 | 30 ₹2.1 L | 5 ₹34,500 | 8.9 ₹61,410 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST (Ordinary Earth) | 18,000 | Cum | 120 ₹21.6 L | 120 ₹21.6 L | 135 ₹24.3 L | 70 ₹12.6 L | 60 ₹10.8 L | 60 ₹10.8 L | 60 ₹10.8 L | 120 ₹21.6 L |
| 3.00 | Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cuttingand excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 19,500 | Cum | 62.9 ₹12.3 L | 50 ₹9.8 L | 100 ₹19.5 L | 50 ₹9.8 L | 30 ₹5.8 L | 80 ₹15.6 L | 40 ₹7.8 L | 62.9 ₹12.3 L |
| 4.00 | Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. MORT&H Specification 301 Sr No 3.3 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 18,290 | Cum | 116.4 ₹21.3 L | 80 ₹14.6 L | 50 ₹9.1 L | 60 ₹11.0 L | 80 ₹14.6 L | 40 ₹7.3 L | 60 ₹11.0 L | 116.4 ₹21.3 L |
| 5.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST (Carted Earth) | 1,000 | Cum | 180 ₹1.8 L | 180 ₹1.8 L | 135 ₹1.4 L | 70 ₹70,000 | 80 ₹80,000 | 90 ₹90,000 | 35 ₹35,000 | 180 ₹1.8 L |
| 6.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 3,170 | Cum | 82 ₹2.6 L | 70 ₹2.2 L | 100 ₹3.2 L | 50 ₹1.6 L | 60 ₹1.9 L | 40 ₹1.3 L | 40 ₹1.3 L | 82 ₹2.6 L |
| 7.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 14,270 | Cum | 3,978 ₹5.7 Cr | 2,900 ₹4.1 Cr | 3,250 ₹4.6 Cr | 2,500 ₹3.6 Cr | 2,700 ₹3.9 Cr | 2,300 ₹3.3 Cr | 2,500 ₹3.6 Cr | 3,900 ₹5.6 Cr |
| 8.00 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 7,375 | Cum | 4,645 ₹3.4 Cr | 3,300 ₹2.4 Cr | 3,400 ₹2.5 Cr | 2,700 ₹2.0 Cr | 2,900 ₹2.1 Cr | 2,200 ₹1.6 Cr | 2,500 ₹1.8 Cr | 4,200 ₹3.1 Cr |
| 9.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 43,490 | Sqm | 36.6 ₹15.9 L | 30 ₹13.0 L | 37 ₹16.1 L | 20 ₹8.7 L | 20 ₹8.7 L | 20 ₹8.7 L | 20 ₹8.7 L | 36.6 ₹15.9 L |
| 10.00 | Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST | 5,148 | Cum | 10,497 ₹5.4 Cr | 10,400 ₹5.4 Cr | 11,300 ₹5.8 Cr | 8,000 ₹4.1 Cr | 9,800 ₹5.0 Cr | 9,000 ₹4.6 Cr | 9,000 ₹4.6 Cr | 10,000 ₹5.1 Cr |
Updated dates
Tender Value
₹26.6 Cr
EMD Value
₹39.9 L
Closing Date
19 Mar 2026, 12:00 pmClosed
SE BSR Circle PWDBulandshahar
SE BSR Circle PWDBulandshahar
Widening Strengthening of Anupshahar Shikarpur road in District Bulandshahar Ch 13 00 to 25 850
2026_CEMRT_1114927_1
11000/96M(3)/E-Tender/25-26 Dt. 30.12.2025
Open Tender
Civil Works - Roads
365 days
Khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹39.9 L
Yes
20 Apr 2026
11 Feb 2026
19 Mar 2026
11 Feb 2026
19 Mar 2026
11 Feb 2026
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. By Mechanical Means using Hydraulic excavator as per MORT&H clause 3.15 305.4.3 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST (Ordinary Earth)
Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cuttingand excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. MORT&H Specification 301 Sr No 3.3 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST (Carted Earth)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing and laying dense graded bituminous macadam Grading 2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing and applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 .Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. (as per DSR Vol-II SI.No. 16.91.2) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing & laying of 1000 mm hume pipe in position including supply of all material, labour, T&P all taxes, labour cess etc required for proper completion of work as per PWD specifications including all type of taxes, octroi, tolls,cess but excluding cost of GST and as per direction of engineer incharge.
RCC Grade M30 using batching plant & Concrete pump .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
RCC Grade M20 using batching plant transit mixer & Concrete pump MORT&H Specification 1500,1700 & 2200 Sr No 13.05 RCC Grade M20 (DRAIN) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Plain/Reinforced Cement Concrete in sub-structure complete as per Drawing and Technical Specifications.PCC Grade M15 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Providing weep holes in Brick masonry/ Plain Reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical Specifications. .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 (Dismantling Brick / Tile work) MORTH 2.4(202) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Brick on edge pavement with strength over burnt brick on parties with bricks, lead, dry joints filled with fine sand including preparation of base to proper slope, and its remaining, spreading layer of 1 cm (3/8") depth of local sand over the subgrade and including supply of all materials, labour, tools and plants etc. required for proper completion of the work. SOR Sl no. 5.03 .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc 5th kilometre stone (precast) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc Ordinary kilometer stone (precast) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc Hectometer stone (precast) .Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST
Routine Maintenance of road for 05 Year after the completion of work vide GO NO. 17/2024 SA - 113/23-1-2024-23-1099/ 113/2023 Dt. 16.01.2024 & Letter No. 36890 C / RMC Mool -23-24 Dt. 17.02.2024 of ENC PWD Lunknow Rate Excluding Cost of GST First Year maintenace Charge @ 0.00%
Second Year maintenace Charge @ 0.25%
Third Year maintenace Charge @ 0.50%
Forth Year maintenace Charge @ 0.75%
FifthYear maintenace Charge @ 1.0%
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
technical_2068156.pdf
techsummary_2068156.pdf
finance_2068156.pdf
BOQ Comparative Chart
xlsx
finsummary_2068156.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_2068156.xls
BOQ • 0.33 MB
SBD.pdf
Tender Documents • 3.18 MB
Download all tender documents and submit your bid