Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹87.5 LAccepted-AOC 1 VISHVAS NAGAR GONIANA ROAD BATHINDA 151 003 | BATHINDA | BATHINDA | PUNJAB | 151003 | L-1 | Accepted-AOC Rates are exclusive of GST. | |
| 2 | L-2₹87.5 L+₹5,796 (0.07%)Rejected-Finance KIRPA BHAWAN PLOT Y 20 BLOCK EP SECTOR V SALTLAKE KOLKATA 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | L-2 | Rejected-Finance Quoted rates are high. | |
| 3 | L-3₹87.8 L+₹32,872 (0.38%)Rejected-Finance FLAT NO 10 2ND FLOOR SODDHI TERRECSES RAYKAR NAGAR DHAYARI PUNE 411041 | PUNE | PUNE | MAHARASHTRA | 411041 | L-3 | Rejected-Finance Quoted rates are high. | |
| 4 | L-4₹1.5 Cr+₹63.3 L (72.3%)Rejected-Finance SCO NO 14 TRANSPORT NAGAR REGD BATHINDA 151003 PUNJAB | BATHINDA | BATHINDA | PUNJAB | 151003 | L-4 | Rejected-Finance Quoted rates are high. |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
6 Nov 2020, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, MM-1 Circle, GHTP, Lehra Mohabbat
SE, MM-1 Circle, GHTP, Lehra Mohabbat 151111
Lehra Mohabbat Stage-I and II on lump-sum basis for a period of one year.
2020_POWER_53828_1
174/MMI/TGM-82VIII/GHTP/2020
Open Tender
Power/Energy Projects/Products
Tender cum Auction
365 days
SE, MM-1 Circle, GHTP, Lehra Mohabbat
Bidders will have to register themselves before participation.
4 documents required · 4 mandatory
₹2,360
TIA
₹2.2 L
Yes
20 Nov 2020
22 Sept 2020
9 Nov 2020
22 Sept 2020
6 Nov 2020
22 Sept 2020
120 days
Routine, breakdown, preventive maintenance and overhauling jobs (Mechanical works) of Turbine, Generator & their auxiliaries, HP Bypass, LP Bypass, Regenerative system, condenser, piping & valves etc. of 2x210MW and 2x250MW units of GHTP, Lehra Mohabbat Stage-I&II on lump-sum basis for a period of one year.
On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work , considering any one unit running and keeping balance three units available for running as and when required
On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work for running of all the four units
To attend to various jobs during annual overhaul pertaining to Turbine, Generator and their auxiliaries, HP Bypass, LP Bypass, Regenerative system condenser,, piping and valves etc. of 2x210 MW & 2x250 MW Units falling under TG maintenance cell on lump-sum basis on any one unit of GHTP Stage-I or Stage-II as per scope of work in Section-VIII Sr No.(B)-I to V.
To attend various jobs during capital overhaul pertaining to Turbine, Generator and their auxiliaries, HP Bypass, LP Bypass, Regenerative system , condenser, piping and valves etc.of any one unit of GHTP Stage-I or Stage-II as per scope of work in Section-VIII(C) Sr No.(B)-I to V.
SWAMINA INTERNATIONAL PRIVATE LIMITED
Gill Engineering Pvt. Ltd.
Alex Engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .