Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC AROCKIAMATHA ILLAM MULAGUMOODU POST KANIYAKUMARI 629167 | KANIYAKUMARI | KANYAKUMARI | TAMIL NADU | 629167 | ₹1.6 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L3₹1.7 CrRejected-AOC NO 9 1 3RD FLOOR RATHINAM KANNUSAMY COMPLEX AGILMEDU 6TH STREET ERODE 638 001 | ERODE | TAMIL NADU | 638001 | ₹1.7 Cr | L3 | Rejected-AOC Third Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Live certificate not submit. Hence Rejected. |
| Sl No | Description | Qty | Unit | PUNITHA AROKIAMATHA CONSTRUCTION COMPANY L1 | SEVENTH CARTEL L2 | REALITY ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 285 | M3 | 317.63 ₹90,524.55 | 321.46 ₹91,616.10 | 325 ₹92,625 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means | 20 | M3 | 5,514.25 ₹1.1 L | 5,580.84 ₹1.1 L | 5,649 ₹1.1 L |
| 3.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 63 | M3 | 159.42 ₹10,043.46 | 161.34 ₹10,164.42 | 163 ₹10,269 |
| 4.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 109 | M3 | 373.62 ₹40,724.58 | 378.13 ₹41,216.17 | 382 ₹41,638 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 42 | M3 | 347.33 ₹14,587.86 | 351.53 ₹14,764.26 | 355 ₹14,910 |
| 6.00 | Damp proof course as per IS 3067:1988 with Cement Mortar 1:4 (One Cement and Four crushed stone sand) 12mm thick mixed with best approved quality Integral liquid water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used , finishing and curing etc. complete complying with standard specification - Manual Mixing | 36 | M2 | 303.11 ₹10,911.96 | 306.77 ₹11,043.72 | 310 ₹11,160 |
| 7.00 | Providing ANTI-TERMITE treatment to soil adjacent under building foundation, plinth periphery of the building by application of chemicals of ISI 63613 part I to IV in stages to suit the progress of work as per the detailed specification as below. Including breaking of termite mounds, making holes with clow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport and storing etc., complete and as directed by the departmental officers. | 234.52 | M2 | 145.48 ₹34,117.97 | 147.24 ₹34,530.72 | 149 ₹34,943.48 |
| 7.01Stage-1:Spraying anti-termite chemical solution for the foundation before laying concrete in bottom and sides of foundation. | ||||||
| 7.02Stage-2:Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth. | ||||||
| 7.03Stage-3: Spraying anti-termite chemical solution on the M-Sand for the flooring before laying the flooring concrete. This treatment has to be carried out on the M-Sand filling by making holes with crow bar to a depth of 60 cms and at 60cms intervals on both. | ||||||
Tender Value
₹1.6 Cr
EMD Value
₹91,000
Closing Date
15 Oct 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Construction of 5 Class room building and Laboratory in Government Higher Secondary School at Valliyoor in Tirunelveli District. (IInd Call)
2025_PWD_612685_1
24(1) SE/2025-26 dated 07.10.2025
Open Tender
Civil Works - Buildings
240 days
Valliyoor
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹91,000
18 Feb 2026
9 Oct 2025
16 Oct 2025
9 Oct 2025
15 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid