| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹34.9 LAccepted-AOC | L-1 | Accepted-AOC RATES ARE FOUND REASONABLE AND THE FIRM BEING L1 BIDDER | |
| 2 | L-2₹35.4 L+₹53,914.51 (1.54%)Rejected-Finance 622 A STREET NO 3 FIRST FLOOR SHAKTI NAGAR BATHINDA 151001 PUNJAB | BATHINDA | PUNJAB | 151001 | L-2 | Rejected-Finance BEING L2 BIDDER | |
| 3 | L-3₹36.2 L+₹1.3 L (3.64%)Rejected-Finance 1 A BASEMENT 30 31 RAJA HOUSE NEHRU PALACE NEW DELHI 110 019 | SOUTH EAST | DELHI | 110019 | L-3 | Rejected-Finance BEING L3 BIDDER | |
| 4 | L-4₹39.6 L+₹4.6 L (13.3%)Rejected-Finance HOUSE NO 29 A SIJUBARI NIZARA PATH PO PS HATTIGAON GUWAHATI 38 | KAMRUP METRO | ASSAM | 781038 | L-4 | Rejected-Finance BEING L4 BIDDER | |
| 5 | L-5₹43.8 L+₹8.8 L (25.3%)Rejected-Finance GOSWAMI COLONY PO UDAYAN VIHAR DISTT KAMRUP ASSAM 781171 | KAMRUP METRO | ASSAM | 781171 | L-5 | Rejected-Finance BEING L5 BIDDER |
| Sl No | Description | Qty | Unit | R K Enterprises L1 | MONA GENERATOR SEVICES PVT. LTD. L3 | Truly Technos LLP L2 | M/S SEWAK SINGH L4 | M.G. ENTERPRISE L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc 30cm deep and averaging 15cm deep and getting out in soft/loose soil, complete all as per specified and as directed by Engineer-in-charge. | 36.5 | SQM | 33 ₹1,204.5 | 153.35 ₹5,597.35 | 30 ₹1,095 Lowest | 40 ₹1,460 | 52 ₹1,898 |
| 2.00 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5 m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc. and getting out in soft/loose soil complete all as per specified and as directed by Engineer-in-charge. | 132.77 | CUM | 166 ₹22,039.82 | 213.24 ₹28,312.36 | 150 ₹19,915.5 Lowest | 210 ₹27,881.7 | 210 ₹27,881.7 |
| 3.00 | M&L for Excavation in post holes (or similar holes) each n.exc 0.5cum in soft/loose soil and getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exceeding 25cm, watering and removing of surplus soil to a distance n.exc 50 meters and making good surface, complete all as per specified and as directed by Engineer-in-charge. | 10 | EACH | 466 ₹4,660 | 326.67 ₹3,266.74 | 180 ₹1,800 | 200 ₹2,000 | 100 ₹1,000 Lowest |
| 4.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers n exc 25cm, including dipositing the surplus soil along the line of pipe/ cable in the form of heap, complete all as per specified and as directed by Engineer-in-charge. | 64.44 | CUM | 33 ₹2,126.52 Lowest | 89.11 ₹5,742.42 | 80 ₹5,155.2 | 60 ₹3,866.4 | 60 ₹3,866.4 |
| 5.00 | Removing excavated material not exc. 50 m & depositing where directed at a level not exc. 1.5 m above starting point complete all as per specified and as directed by Engineer-in-charge. | 60.33 | CUM | 44 ₹2,654.52 Lowest | 55.54 ₹3,350.96 | 75 ₹4,524.75 | 100 ₹6,033 | 300 ₹18,099 |
| 6.00 | M&L for Sand Cushioning (dry) in trenches/ducts for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 230mm Spread thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) upto 180mm thickness, complete all as per specified and as directed by Engineer-in-charge. NOTE : For the purpose of Payment, Punned thickness of Sand Cushioning only will be measured and paid for. | 38.13 | CUM | 777 ₹29,627.01 Lowest | 1,196.44 ₹45,620.27 | 1,000 ₹38,130 | 850 ₹32,410.5 | 1,750 ₹66,727.5 |
| 7.00 | Supply & Laying Fly ash Bricks, laid breadth wise along the length of cable laid in trenches over sand cushion laid for UG cable protection, complete all as specified and as directed by Engineer-in-charge. | 4.24 | PER 1000 NOS | 8,888 ₹37,685.12 Lowest | 16,594.88 ₹70,362.31 | 10,000 ₹42,400 | 9,000 ₹38,160 | 13,000 ₹55,120 |
| 8.00 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. | 4.75 | CUM | 2,222 ₹10,554.5 | 1,663.28 ₹7,900.58 Lowest | 2,100 ₹9,975 | 2,000 ₹9,500 | 3,100 ₹14,725 |
| 9.00 | M&L for earth filling, spreading in layers n exc. 30 cm thick; watering, ramming/rolling and finishing to required size, shape, etc., n exc. 1.5 m high from base, complete all as per specified and as directed by Engineer-in-charge. NOTE- Approved quality earth shall be brought by the contractor outside MoD land and cost of transportation also included in unit quoted rate. | 18.75 | CUM | 799 ₹14,981.25 | 599.67 ₹11,243.89 Lowest | 1,000 ₹18,750 | 600 ₹11,250 | 610 ₹11,437.5 |
| 10.00 | M&L for PCC 1:4:8 type D-2 (40mm graded stone aggregate) as in foundations, fillings and mass concrete complete all as per specified and as directed by Engineer-in-charge. | 1.95 | CUM | 3,888 ₹7,581.6 Lowest | 6,198.96 ₹12,087.98 | 4,300 ₹8,385 | 4,500 ₹8,775 | 6,100 ₹11,895 |
Tender Value
₹36.3 L
EMD Value
₹72,600
Closing Date
21 Jun 2025, 6:00 pmClosed
GE Rangia
GE Rangia C/O 99 APO Rangia
PROVN OF 01 x 125 KVA SILENT DG SET CHANGSARI WITH AMF AND OPERATING PANELS AND 01 X 100 KVA VOLTAGE STABILIZER RANGIA BOTH WITH COVERED SHED AT DIFFERENT LOCATION UNDER GE RANGIA
2025_MES_710317_1
8901/RNG/E8
Open Tender
Electrical and Maintenance Works
Item Rate
150 days
RANGIA AND CHANGSARI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Rangia
₹72,600
Yes
15 Nov 2025
26 May 2025
23 Jun 2025
26 May 2025
21 Jun 2025
9 Jun 2025
26 May 2025 - 2 Jun 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .