Tender Value
Refer Docs
EMD Value
₹19,750
Closing Date
11 Mar 2024, 3:00 pmClosed
Block Development Officer(V.Pt)
Block Development Office
Construction of Thershing Floor and Compound Wall
2024_RDTN_441897_1
958/2024/B1
Open Tender
Civil Works
Item Wise
150 days
Needamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,750
Yes
12 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
Amount
1) CONSTRUCTION OF THRESHING FLOOR AT PERIYAKOTTAI HABITATION IN ATHANUR PANCHAYAT (10X22.50)M
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Filling with carted earth including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Supplying and fabricating and placing in position MS or RTS reinforcement works
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Tar Pad
Provision for Nameboard
2) CONSTRUCTION OF THRESHING FLOOR AT PERIYAKOTTAI HABITATION IN ATHANUR PANCHAYAT (15X15)M
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Filling with carted earth including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Supplying and fabricating and placing in position MS or RTS reinforcement works
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Tar Pad
Provision for Nameboard
3) CONSTRUCTION OF COMPOUND WALL AT SAMATHUVA SUDUKADU PERIYAKOTTAI HABITATION IN ATHANUR PANCHAYAT
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Brick work in CM 1:5 mix using country bricks including cost and conveyanceof all materials and all labour charges etc.,complete Below Basement
Brick work in CM 1:5 mix using country bricks including cost and conveyanceof all materials and all labour charges etc.,complete Above Basement
RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Column
Supplying and fabricating and placing in position MS or RTS reinforcement works
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete Below basement
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete Above basement
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Exterior emulsion two coats using colour pigments including cost and conveyance of all materials and all labour charges etc.,complete
Provision for Nameboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A VIJAY KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .