| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance KOVILPATTI | KOVILPATTI | TAMIL NADU | L1 | Accepted-Finance Accepted | |
| 2 | L2₹1.4 L+₹55.57 (0.04%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹2.4 L
EMD Value
₹2,364
Closing Date
10 Jul 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Sattur
Renovation of School Building in PU Primary School at Kalingapatti Village of Kumarapuram Panchayat
2025_RDTN_573520_1
A7/3427/2024
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,364
Yes
11 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
Renovation School Building
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) 40mm thick
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 23x23x2 cm in CM 1:3 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with approved Black Oxide for Old Black board
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over Old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Providing Teachers Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cup-board Shutter using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Providing Students Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cheppal Rack arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .