Tender Value
₹22.5 L
EMD Value
₹45,000
Closing Date
2 Oct 2023, 6:00 pmClosed
Executive officer Nagar Palika Ratangrah
Executive officer Nagar Palika Ratangrah
Construction And Repair Of Nala At various places in ward 23 to 45 ratangarh
2023_DLB_370179_5
NIB 2389-2393/20-09-2023
Open Tender
Civil Works
Item Rate
90 days
Nagar Palika Ratangrah
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive officer Nagar Palika/MD RISL
₹45,000
Yes
5 Oct 2023
23 Sept 2023
3 Oct 2023
23 Sept 2023
2 Oct 2023
23 Sept 2023
Amount
Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation anddisposal of surplus excavated material at a lead upto 50m suitablesite as per direction of Engineer for following depths, below naturalground / Road top level.
Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Sludge clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr.
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer.Bituminous courses
Dismantling of flexible pavements and disposal of dismantled. materials up to a lead of 50 metres as directed by Engineer.Granular courses
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth , Sand, bazri, ballast, kankar
Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size).
Brick work with FPS bricks of class designation 75 in Foundation and plinth level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
Cement plastering including T&P, scaffolding, material and completelabpour, including cost of water, curing, racking of joints etc. with 12mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge.
Removing & re-fixing of stone slab flooring set in pattern over 20 mm thick base of cement mortar 1:6 (1 cement : 6 course sand) and finished with cement sand mortar 1:3 complete in all respect.
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.450 mm
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.450 mm internal diameter 400 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.450 mm internal diameter 350 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.450 mm internal diameter 300 mm internal diameter
Supply and fixing stone lintels/bed plates of approved quarry rough dressed in cement morter 1:4: upto 15cm thick.
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in charge. 3.1.1 In cement mortar
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
M/S MARUTI CONSTRUCTION AND SUPPLIERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .