Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -13.62% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹5.1 L (4.19%)Admitted-Finance | -10.00% | ₹1.3 Cr+₹5.1 L (4.19%) | L2 | Admitted-Finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
22 Jun 2026, 5:00 pmClosed
VICE CHAIRMAN GHAZIABAD DEVELOPMENT AUTHORITY
GDA OFFICE VIKAS PATH GHAZIABAD
Horticulture development and maintenance work of aperiod of two years on the central verge and both sides of the newly constructed 18, 24, 30, and 45 meter wide roads in Rajnagar Extension.
2026_GDAUP_1157667_1
139/Horticulture/2026 Date 05-06-2026 (S.n.-1)
Open Tender
Miscellaneous Works
Percentage
790 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,198
AS PER LINK PROVIDED IN TENDER DOCUMENT
₹2.8 L
1 Sept 2026
6 Jun 2026
24 Jun 2026
8 Jun 2026
22 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m: 2.28.1 All kinds of soil. DSR 2020 (23.80x0.90=21.42x111/100 = 23.77) | 38,875 | sqm | 23.77 | ₹9,24,058.75 |
| 2 | Fine dressing the grounding. 2.7/D.S.R. 2020 (3.70x0.90=3.11x111/100 = 3.69) | 38,875 | sqm | 3.69 | ₹1,43,448.75 |
| 3 | Preparation of beads for heading and shrubbery by excavating 60cm deep and trenching the excavated bass to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto1.5m complete (cost of sludge, manure or extra earth to be paid for separately) 2.13/D.S.R. 2020 (222.85x0.90=200.565x111/100 = 222.62) | 1,011 | cum | 222.62 | ₹2,25,068.82 |
| 4 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 60 cm dia and 60 cm dep. 2.14.3/D.S.R. 2020 (43.75x0.90=39.375x111/100 = 43.70) | 2,224 | nos | 43.7 | ₹97,188.8 |
| 5 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia and 45 cm dep. 2.14.4/D.S.R. 2020 (18.70x0.90=16.83x111/100 = 18.68) | 18,300 | nos | 18.68 | ₹3,41,844 |
| 6 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 km lead complete (Cattle manure measured in stacking will be reduced by 8% for payment). 2.25/D.S.R. 2020 (247.50x0.90=222.75x111/100 = 247.25) | 1,353.8 | cum | 247.25 | ₹3,34,727.05 |
| 7 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge2.35/DSR 2020 (50.80x0.90=45.72x111/100 = 50.75) | 4,121 | sqm | 50.75 | ₹2,09,140.75 |
| 8 | Grassing with selection No-1 ‛Doob’ grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thicks lawn free from weeds and fit for mowing including supplying good earth if needed (the good earth shall be paid for separately). In rows 5cm apart in either direction. 2.10.1/D.S.R. 2020 (17.70x0.90=15.93x111/100 = 17.68) | 30,905 | sqm | 17.68 | ₹5,46,400.4 |
| 9 | Spreading of sludge, dump manure or/and good earth in required thickness (cost of sludge, dump manure or/and good earth to be paid separately). 2.8/D.S.R. 2020 (52.35x0.90=47.11x111/100 = 52.29) | 1,025.05 | cum | 52.29 | ₹53,599.86 |
| 10 | Providing and stacking of Ficus benjamina (green) of height 120-135 cm. with 6-8 branches and lush green foliage in g. bags of size 25 cm as per direction of the officer-in-charge.7.26/DSR2020 | 5,520 | nos | 105 | ₹5,79,600 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
139_1.pdf
Tender Documents • 1.29 MB
BOQ_2169436.xls
BOQ • 0.38 MB
TenderDate_Extend.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .