| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-Finance | 1 | Accepted-Finance accepted | |
| 2 | 2₹5.6 L+₹1.2 L (26.3%)Rejected-Finance | 2 | Rejected-Finance Rejected |
Tender Value
₹4.3 L
EMD Value
₹8,623
Closing Date
7 Jun 2024, 6:00 pmClosed
Executive engineer Civil
BSNL Civil Division Sanchar Bhavan Gandhi Market Itanagar
C O new drain line from rear side of store to front corner of compound and new culvert outside gate at Banderdewa store compound ARP
2024_BSNL_197017_1
NIT No. 02/EE/BSNL/CD/2024-25 dated 30.05.2024
Open Tender
Civil Works - Others
Item Rate
30 days
Banderdewa
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
BSNL
₹8,623
Yes
22 Jun 2024
31 May 2024
10 Jun 2024
31 May 2024
7 Jun 2024
31 May 2024
31 May 2024 - 6 Jun 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix :
1:6 (1 cement: 6 coarse sand)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
In cement mortar
Removal of debris, slush, waste materials and any other obstructing material from the open surface drain of size 31.00 m x 3.00m x 1.00m which is passing through the BSNL compound.
Removing tree roots from compound wall/ building walls at any heights including washing with acid to stop further growth, all as per direction of Engineer in charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved.
TAKAM KAKO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .