Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84,551.69Admitted-Finance | -37.00% | ₹84,551.69 | L1 | Admitted-Finance |
| 2 | L2₹89,958.89+₹5,407.20 (6.40%)Admitted-Finance | -32.97% | ₹89,958.89+₹5,407.20 (6.40%) | L2 | Admitted-Finance |
| 3 | L3₹98,158.93+₹13,607.24 (16.1%)Admitted-Finance | -26.86% | ₹98,158.93+₹13,607.24 (16.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 L+₹20,131.04 (23.8%)Admitted-Finance | -22.00% | ₹1.0 L+₹20,131.04 (23.8%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 L+₹21,538.87 (25.5%)Admitted-Finance | -20.95% | ₹1.1 L+₹21,538.87 (25.5%) | L5 | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹2,680
Closing Date
15 Jul 2026, 2:00 pmClosed
Executive Engineer TCC Division Jammu
Office of the Executive Engineer TCC Division Jammu
Permanent Restoration of D-10 of Main Tawi Canal from RD 1900M by way of construction of cement concrete canal section at completely damaged spot.
2026_IFC_314032_4
e-NIT No. 03 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer TCC Division Jammu
₹2,680
22 Aug 2026
30 Jun 2026
16 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 4.27 | cum | 1 | ₹4.27 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 17.1 | cum | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 85.5 | sqm | - | - |
| 4 | Sand and aggregate for average 10 KM distance. | 24.11 | cum | - | - |
| 5 | Sand and aggregate by manual means for average 50 distance. | 12.06 | cum | 1 | ₹12.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1016681.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .