| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-AOC 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | 1 | Accepted-AOC L1 lowest | |
| 2 | 2₹6.0 L+₹21,729.70 (3.75%)Rejected-AOC | 2 | Rejected-AOC L2 highest |
| Sl No | Description | Qty | Unit | M/s A.Chelladurai & Co L1 | MARSTRONZ INFRA L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing scrub jungle in the site and disposing off to a place away from the site including cost of all labour, tools, lead , lift, etc., complete | 150 | m2 | 5 ₹750 Lowest | 6.7 ₹1,005 |
| 2.00 | Earth work excavation for foundation in hard stiff clay, Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as directed, depositing the surplus earth in places as shown with an initial lead & lift of 10 mts & 2 mts, etc., complete | 20 | m3 | 250 ₹5,000 Lowest | 270 ₹5,400 |
| 3.00 | Earth work excavation for foundation in soft disintegrated rock, laterite, soft rock or kankar and to full depth as directed, depositing the surplus earth in places as shown with an initial lead & lift of 10 mts & 2 mts, etc., complete | 9 | m3 | 400 ₹3,600 Lowest | 400 ₹3,600 Lowest |
| 4.00 | Supplying and filling in foundation, basement, etc with filling sand including cost of all material, labour, well watered, rammed and consolidated etc. complete | 2.5 | m3 | 1,800 ₹4,500 | 1,760 ₹4,400 Lowest |
| 5.00 | Providing & laying P.C.C 1:3:6 using 20 mm HBGS jelly for foundation including cost of all material, labour charges, well rammed, consolidated and curing etc. complete | 4 | m3 | 6,500 ₹26,000 | 6,350 ₹25,400 Lowest |
| 6.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for footing concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete | 3 | m3 | 9,000 ₹27,000 Lowest | 9,577 ₹28,731 |
| 7.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for column concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete | 2 | m3 | 22,000 ₹44,000 Lowest | 22,162 ₹44,324 |
| 8.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for Grade beam concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete | 5 | m3 | 16,000 ₹80,000 Lowest | 16,550 ₹82,750 |
| 9.00 | Supplying, fabricating and placing in position M.S/R.T.S for all RCC works as per design given in all floors including cost of steel and binding wire, etc., complete. | 930 | kg | 95 ₹88,350 Lowest | 98 ₹91,140 |
| 10.00 | Brick work in C.M 1:5 using IInd Class Ground Moulded Chamber Burnt Bricks 9" x 4-3/8" x 2-3/4" for foundation and basement, super structure including including cost of all material, labour, curing, etc., complete | 13 | m3 | 7,000 ₹91,000 Lowest | 7,300 ₹94,900 |
Tender Value
₹4.9 L
EMD Value
₹5,900
Closing Date
7 Oct 2025, 2:00 pmClosed
SE/CEDC/SOUTH/CBE
O/o.SE/CEDC/SOUTH/CBE
Improvement work by Providing protection wall in west side of 110 KV yard side in Somanur 110 11 KV SS
2025_EB_607495_1
SE/CEDC/SOUTH/CBE/No.04/25-26
Open Tender
Civil Works - Buildings
Works
SOMANUR SS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
14 Nov 2025
22 Sept 2025
8 Oct 2025
22 Sept 2025
7 Oct 2025
22 Sept 2025
Amount
Clearing scrub jungle in the site and disposing off to a place away from the site including cost of all labour, tools, lead , lift, etc., complete
Earth work excavation for foundation in hard stiff clay, Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as directed, depositing the surplus earth in places as shown with an initial lead & lift of 10 mts & 2 mts, etc., complete
Earth work excavation for foundation in soft disintegrated rock, laterite, soft rock or kankar and to full depth as directed, depositing the surplus earth in places as shown with an initial lead & lift of 10 mts & 2 mts, etc., complete
Supplying and filling in foundation, basement, etc with filling sand including cost of all material, labour, well watered, rammed and consolidated etc. complete
Providing & laying P.C.C 1:3:6 using 20 mm HBGS jelly for foundation including cost of all material, labour charges, well rammed, consolidated and curing etc. complete
R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for footing concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete
R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for column concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete
R.C.C 1:1.5:3 using 12 to 20 mm HBGS jelly for Grade beam concrete including cost of all material, labour, centering and shuttering, laying, vibrating with vibrators, finishing, curing, etc but excluding cost of reinforcement gril, complete
Supplying, fabricating and placing in position M.S/R.T.S for all RCC works as per design given in all floors including cost of steel and binding wire, etc., complete.
Brick work in C.M 1:5 using IInd Class Ground Moulded Chamber Burnt Bricks 9" x 4-3/8" x 2-3/4" for foundation and basement, super structure including including cost of all material, labour, curing, etc., complete
Plastering in C.M 1:5, 12mm thick in all walls surfaces including cost of all material, scaffolding, labour, curing etc. complete
Painting the exterior walls with two coats of ready mixed exterior emulsion paint of first class quality and of approved colour over a primer coat including cost of all materials, labour, scrapping the walls with sand paper, scaffolding, etc., complete
Refilling with excavated earth other than sand complying with standard specification for filling in foundation & bastement, well rammed, watered and consolidated etc. complete
Transporting of excess excavated soil away from the site to the nearby bund or low lying area shown by the departmental officers complete
Supplying, fabrication, galvanising and fixing of GI angles for "Y" posts of size 50x50x6mm & height 0.30m, 2 Nos of 150mm length for Y position to hold the barbed wire fencing, with glavanishing including cost of fixing charges, all materials, lead, lift as per standard specification etc., complete.
Supplying and fixing of GI barbed wire of approved quality and gauge including of barbed wire and tensioning of 3 rows in horizontal , lead, lift, labour, etc., complete
Painting iron works with one coats of synthetic enamel paint first quality and approved colour over a red oxide priming coat of including cost of all materials, labour, priming coat, etc., complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
MARSTRONZ INFRA (BID ID -1481167)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .