Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.1 L+₹62,632.47 (9.65%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shree Amman Arul Enterprises L1 | THIRUMURUGAN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 2.00Sweeping and mopping | |||||
| 2.01 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 3,96,133.08 | 1 m2 | 4,67,437.03 ₹4,67,437.03 Lowest | 3,96,133.08 ₹4,67,437.03 Lowest |
| 2.02 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (Monthly four times)(188.08 sq.mt. * 12) (monthly 4 times) | 9,027.84 | 1 m2 | 10,652.85 ₹10,652.85 Lowest | 11,375.08 ₹13,422.59 |
| 2.03 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 3,302.28 | 1 m2 | 3,896.69 ₹3,896.69 Lowest | 4,160.87 ₹4,909.83 |
| 2.04 | Sweeping and mopping of the office floors (Battery room flooring with cement mortar) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste paper daily, Dusting and cleaning of files records in racks, furniture’s for twice in a week ,cleaning of all partition walls, ceilings [Brick, wooden &Aluminium, glazed],staircase, handrails, doors, windows, blinds, name boards, electrical fittings viz. Tube lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the office complex, with all general cleaning inside the office floors etc…complete as directed by the engineer at site including the cost of all labour, labour uniforms, lead lift, T&P, cost of all consumable materials such as cleaning powder, broom sticks, cobweb sticks, bamboo baskets, swabs, mops, Dungry cloth, buckets, cost of all the consumable extra complete | 57,981.6 | 1 m2 | 60,300.86 ₹60,300.86 | 38,267.86 ₹45,156.07 Lowest |
| 3.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell (1 time in a day). | |||||
| 3.01 | Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) 113.10*12*25 | 34,140 | 1 m2 | 47,796 ₹47,796 Lowest | 44,382 ₹52,370.76 |
| 3.02 | Water closets (IWC / EWC) (20*12*25) | 3,600 | Each | 14,400 ₹14,400 Lowest | 36,000 ₹42,480 |
| 3.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls (7*12*25) | 2,400 | Each | 6,720 ₹6,720 Lowest | 20,400 ₹24,072 |
| 3.04 | Washbasins (20*12*25) | 3,600 | Each | 10,080 ₹10,080 Lowest | 18,000 ₹21,240 |
Tender Value
Refer Docs
EMD Value
₹7,300
Closing Date
18 Aug 2026, 3:00 pmClosed
SE/O/N/CNI
230kV Korattur SS Campus,Chennai-80
Housekeeping of office floors and cleaning of toilets, open areas and allied maintenance works at 765/400kV NCPS GIS for a period of one year from date of handing of the site
2026_EB_689673_1
E02/2026-2027/SE/O/N/CNI
Open Tender
Miscellaneous Works
Works
365 days
765kV North Chennai Pooling Station, Edayanchavadi
Refer specification
4 documents required · 4 mandatory
₹0
₹7,300
Yes
12 Oct 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
18 Aug 2026
8 Aug 2026
31 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Sweeping and mopping | |||||
| 2.01 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 3,96,133.08 | 1 m2 | - | - |
| 2.02 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (Monthly four times)(188.08 sq.mt. * 12) (monthly 4 times) | 9,027.84 | 1 m2 | - | - |
| 2.03 | Sweeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and clearing of files records in racks, furnitures for twice in a week, cleaning of all the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 3,302.28 | 1 m2 | - | - |
| 2.04 | Sweeping and mopping of the office floors (Battery room flooring with cement mortar) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste paper daily, Dusting and cleaning of files records in racks, furniture’s for twice in a week ,cleaning of all partition walls, ceilings [Brick, wooden &Aluminium, glazed],staircase, handrails, doors, windows, blinds, name boards, electrical fittings viz. Tube lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the office complex, with all general cleaning inside the office floors etc…complete as directed by the engineer at site including the cost of all labour, labour uniforms, lead lift, T&P, cost of all consumable materials such as cleaning powder, broom sticks, cobweb sticks, bamboo baskets, swabs, mops, Dungry cloth, buckets, cost of all the consumable extra complete | 57,981.6 | 1 m2 | - | - |
| 3Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell (1 time in a day). | |||||
| 3.01 | Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) 113.10*12*25 | 34,140 | 1 m2 | - | - |
| 3.02 | Water closets (IWC / EWC) (20*12*25) | 3,600 | Each | - | - |
| 3.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls (7*12*25) | 2,400 | Each | - | - |
| 3.04 | Washbasins (20*12*25) | 3,600 | Each | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 0.56 MB
Tendernotice_3.pdf
PDF • 0.11 MB
BOQ_829060.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .