Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance VILL DIGHARA POST DUTTAPUKUR P S ASHOKNAGAR | JHARGRAM | WEST BENGAL | 721121 | ₹6.2 L | L1 | Accepted-Finance lowest rate |
| 2 | L2₹6.2 L+₹476.72 (0.08%)Rejected-Finance 22 2A NAKULESWAR BHATTACHARJEE LANE KOLKATA 700 026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | ₹6.2 L+₹476.72 (0.08%) | L2 | Rejected-Finance higher rate |
| 3 | L3₹6.2 L+₹715.08 (0.12%)Rejected-Finance AS 8 4 ARJUNPUR KOLKATA 700059 | KOLKATA | KOLKATA | WEST BENGAL | 700059 | ₹6.2 L+₹715.08 (0.12%) | L3 | Rejected-Finance highest rate |
| Sl No | Description | Qty | Unit | GHOSH AND GHOSH L2 | TALUKDER AND CO. L1 | S.M. ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged pump motor set after disconnection of all connection by deploying skilled personnel & kept at site all complete as per direction of E.I.C. | 1 | Item | 3,550 ₹3,550 | 3,450 ₹3,450 Lowest | 3,575 ₹3,575 |
| 2.00 | Supply and delivery at site of horizontal split casing Centrifugal pumping machinery having capacity 100 M3/Hr. against a total head of 35 mtrs, coupled with suitable rating squirrel cage TEFC ,IE3 foot mounted motor suitable for 3 Ph, 415V± 10%, 50 Hz ,1500 rpm, continuous rating ( S1 Duty) IP-55 enclosure, with Class ‘F’ insulation suitable for ambient temperature 50ºC ( Temperature rise limited to class “B” )
Make:- Pump-Kirloskar/Mather & Platt/WPIL/Any other approved make.
Motor- Crompton Greaves / Kirloskar/ KEC/ABB/Marathon/Any other approved make.
[ Test Certificates, Characteristic Curve, Guarantee Certificates should be submitted at the time of delivery] | 1 | Set | 4,91,000 ₹4,91,000 | 4,90,850 ₹4,90,850 Lowest | 4,91,100 ₹4,91,100 |
| 3.00 | Installation of above pump-motor set on its existing position as in item no.2 after making suitable size new foundation of pump-motor & connecting with existing delivery pipeline by supplying all other necessary materials and proper alignment complete as per direction of E.I.C. | 1 | Item | 22,050 ₹22,050 | 21,975 ₹21,975 Lowest | 22,100 ₹22,100 |
| 4.00 | Testing, Commissioning the whole installation upto entire satisfaction of E.I.C. | 1 | Item | 3,550 ₹3,550 | 3,475 ₹3,475 Lowest | 3,575 ₹3,575 |
| 5.00 | Add: GST @ 18% | 1 | item | 93,627 ₹93,627 | 93,555 ₹93,555 Lowest | 93,663 ₹93,663 |
| 6.00 | Add: Labour Welfare Cess @ 1% | 1 | item | 6,137.77 ₹6,137.77 | 6,133.05 ₹6,133.05 Lowest | 6,140.13 ₹6,140.13 |
Tender Value
Refer Docs
EMD Value
₹12,751
Closing Date
17 Aug 2026, 5:00 pmClosed
Executive Engineer Eastern Mechanical Division P.
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG KOL 73
Renovation of Centrifugal pumping machinery arrangement with allied works at P/H No.-High Lift (Pump No-2) of Taki Municipality ground water-based W/S scheme under EMD, PHE Dte. in 24Pgs(N).
2026_PHED_1033283_7
WBPHED/EE/EMD/NIET-04/2026-27
Open Tender
Miscellaneous Works
Item Wise
30 days
Executive Engineer EMD, PHED, P-16, CIT ANNEX BLDG
Please refer Tender documents.
6 documents required · 6 mandatory
₹12,751
16 Sept 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing damaged pump motor set after disconnection of all connection by deploying skilled personnel & kept at site all complete as per direction of E.I.C. | 1 | Item | - | - |
| 2 | Supply and delivery at site of horizontal split casing Centrifugal pumping machinery having capacity 100 M3/Hr. against a total head of 35 mtrs, coupled with suitable rating squirrel cage TEFC ,IE3 foot mounted motor suitable for 3 Ph, 415V± 10%, 50 Hz ,1500 rpm, continuous rating ( S1 Duty) IP-55 enclosure, with Class ‘F’ insulation suitable for ambient temperature 50ºC ( Temperature rise limited to class “B” )
Make:- Pump-Kirloskar/Mather & Platt/WPIL/Any other approved make.
Motor- Crompton Greaves / Kirloskar/ KEC/ABB/Marathon/Any other approved make.
[ Test Certificates, Characteristic Curve, Guarantee Certificates should be submitted at the time of delivery] | 1 | Set | - | - |
| 3 | Installation of above pump-motor set on its existing position as in item no.2 after making suitable size new foundation of pump-motor & connecting with existing delivery pipeline by supplying all other necessary materials and proper alignment complete as per direction of E.I.C. | 1 | Item | - | - |
| 4 | Testing, Commissioning the whole installation upto entire satisfaction of E.I.C. | 1 | Item | - | - |
| 5 | Add: GST @ 18% | 1 | item | - | - |
| 6 | Add: Labour Welfare Cess @ 1% | 1 | item | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_2542520.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .