Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Finance M S YADAV CONSTRUCTION SCF NO 459 1ST FLOOR MOTOR MARKET MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | L1 | Admitted-Finance | ||
| 2 | L2₹16.7 L+₹38,230.17 (2.34%)Admitted-Finance 94 1ST FLOOR RAIPUR KHURD CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | L2 | Admitted-Finance |
Tender Value
₹17.1 L
EMD Value
₹34,134
Closing Date
21 Sept 2026, 12:00 pmClosed
Executive Engineer Roads Division No 2 MC Chd
Executive Engineer Roads Division No 2 MC Chd
CONSTRUCTION OF MODEL VENDING ZONE SECTOR-13 MANIMAJRA, CHANDIGARH.
2026_MCC_95326_1
2026/R2/156
Open Tender
Civil Works
Percentage
90 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹34,134
14 Oct 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge. (DSR 16.82) | 97.56 | Rmt | 28 | ₹2,731.68 |
| 2 | Taking out existing cement concrete PCC tile from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 490.71 | Sqm | 94 | ₹46,126.74 |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR 15.60) | 13.46 | Cum | 218 | ₹2,934.28 |
| 4 | Earth work in excavation by Mechanical means ( Hydraulic excavator) manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, and excluding of disposed earth to be leveled and neatly dresses | 108.98 | Cum | 98 | ₹10,680.04 |
| 5 | Carriage of Sand, stone aggregate by mechanical transport including loading, unloading and stacking for the lead of 5 Km .(DSR 1.1.2) | 108.98 | Cum | 149.43 | ₹16,284.88 |
| 6 | Preparation of sub grade including trenching, rough dressing of soil, final dressing of earth to give level and camber, watering, rolling with a road roller and compaction of bed complete in all respect. | 483.27 | Sqm | 4 | ₹1,933.08 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: ( 1 Cement: 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 86.89 | Cum | 4,227 | ₹3,67,284.03 |
| 8 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) Coarse sand. (DSR : 6.1.1) | 10.62 | Cum | 7,119.64 | ₹75,610.58 |
| 9 | Centring and shuttering including strutting, propping etc. Foundations, footings, bases of columns, etc. for mass concrete (DSR 5.9.1) | 8.92 | Sqm | 271 | ₹2,417.32 |
| 10 | Centring and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts. DSR 5.9.6 | 2.23 | Sqm | 284 | ₹633.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.90 MB
BOQ_117088.xls
BOQ • 0.36 MB
Extend.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .