Loading…
Loading…
Tender Value
₹47.6 L
EMD Value
₹95,160
Closing Date
31 Aug 2026, 6:00 pm3d left
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNCIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of protection/retaining wall near H/o Bilal Ahmad Misgar, Tariq Umar Ahanger AND others at Sheikh Hamza Colony, Gulshan Abad, Sector 01 Zakura Phase-I
2026_HAUDD_320544_1
NOTICE INVITING ETENDER No. 26 of 2026-2027 Dated 11.08.2026 RRWD SMC
Open Tender
Civil Works - Others
Percentage
120 days
Hamza Colony, Gulshan Abad, Sector 01 Zakura Phase
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,100
FA/CAO AC NO 0216010200000007
₹95,160
11 Aug 2026
11 Aug 2026
1 Sept 2026
12 Aug 2026
31 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 348.78 | Cum | 187.3 | ₹65,326.49 |
| - | Providing and laying Stone soling including compacting, watering including all carriages of material complete | 17.59 | Cum | 850 | ₹14,951.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size). | 5.63 | Cum | 5,202.9 | ₹29,292.33 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 63.99 | Cum | 7,788.4 | ₹4,98,379.72 |
| - | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 142.05 | Cum | 9,395.7 | ₹13,34,659.19 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 15,554.9 | Kgs | 123.2 | ₹19,16,363.68 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 41.99 | Sqm | 286.35 | ₹12,023.84 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 482.95 | Sqm | 628.95 | ₹3,03,751.4 |
| - | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 199.48 | Sqm | 266.2 | ₹53,101.58 |
| - | Providing laying and fixing of PVC pipes of make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp.
100 mm | 76.22 | Rmt | 365 | ₹27,820.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1065893.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].