Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
22 Jun 2026, 3:00 pm
Kharagpur Division : Transportation of P.Way materials by road from any station of Indian Railway to Work Site/ Store Depot.
E-KGP-WEST-18-2026
E-KGP-WEST-18-2026
Open
12 Months
Dholpur, Rajasthan
₹0
₹4.3 L
25 May 2026
25 May 2026
8 Jun 2026
Item Breakup - A-USSOR-21
2880.00 119.83 possible and traffic block is not required or in Truck/trailer. Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre.
2800.00 118.89 possible and traffic block is not required or in Truck/trailer. Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner.
2880.00 possible and traffic block is not required or in Truck / trailer. Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres.
MT Total 1270208.00
Item Breakup - B-USSOR-21
1400.00 possible and traffic block is not required or in Truck / trailer Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
1840.00 118.45 handling is possible a n d traffic block is not required. Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
MT Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
MT Total 636253.60
Item Breakup - C-USSOR-21
MT KHARAGPUR DIVISION-ENGG/SOUTH EASTERN RLY Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
MT Total 10091216.00
Item Breakup - D-USSOR-21
3.30 over item no. 172047 Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS 1 of GCC April 2022
ATTACHMENT
ACS 2 of GCC April 2022
ATTACHMENT
ACS 3 of GCC April 2022
ATTACHMENT
ACS 4 of GCC April 2022
ATTACHMENT
ACS 5 of GCC April 2022
ATTACHMENT
ACS 6 of GCC April 2022
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
VENDERMANDATEFORM.pdf
ATTACHMENT
MinimumwagesPFESIShramikKalyanPortal.pdf
ATTACHMENT
Annexure-II.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf Retired Rly Employee Declaration
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
LabourLawdtd11052026.pdf
ATTACHMENT
ACS 7 of GCC April 2022
ATTACHMENT
ACS 8 of GCC April 2022
ATTACHMENT
ACS 9 of GCC April 2022
ATTACHMENT
SpecialconditionofContractforallcontract.pdf
ATTACHMENT
CivilSpecialCondition18052026.pdf
ATTACHMENT
SPECIALCONDITIONSFORP.WAYWORKS14042026.pdf P Way Special Codition
ATTACHMENT
ACS 10 of GCC April 2022
ATTACHMENT
SPECIALCONDITIONSFORP.WAYWORKS14042026.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf
ATTACHMENT
ACS-12022_CE-I_CT_GCC-2022_Policydt.14.07.2022.pdf
ATTACHMENT
ACS-22022_CE-I_CT_GCC-2022_Policydt.13.12.2022.pdf
ATTACHMENT
ACS-32022_CE-I_CT_GCC-2022_Policydt.26.04.2023.pdf
ATTACHMENT
ACS-42022_CE-I_CT_GCC-2022_Policydt.07.08.2023.pdf
ATTACHMENT
ACS-52022_CE-I_CT_GCC-2022_Policydt.20.10.2023.pdf
ATTACHMENT
ACS-62022_CE-I_CT_GCC-2022_Policydt.21.12.2023.pdf
ATTACHMENT
ACS-72022_CE-I_CT_GCC-2022_Policydt.25.09.2024.pdf
ATTACHMENT
ACS-82022_CE-I_CT_GCC-2022_Policydt.20.12.2024.pdf
ATTACHMENT
ACS-92022_CE-I_CT_GCC-2022_Policy_Pt.Idt.09.01.2025.pdf
ATTACHMENT
ACS-102022_CE-I_CT_GCC-2022_Policydt.04.03.2025.pdf
ATTACHMENT
ACS-112022_CE-I_CT_GCC-2022_Policy_Pt.Idt.13.03.2026.pdf
ATTACHMENT
CablecuttingPenaltyCirculardated12.06.2023.pdf
ATTACHMENT
BidCapacity.pdf
ATTACHMENT
Download all tender documents and submit your bid