| 1.00 | Normal ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles | 1 | Loc | 450 ₹450 |
| 2.00 | Normal Ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles | 1 | Loc | 500 ₹500 |
| 3.00 | Rocky ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles | 1 | Loc | 680 ₹680 |
| 4.00 | Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles | 1 | Loc | 500 ₹500 |
| 5.00 | Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles | 1 | Loc | 530 ₹530 |
| 6.00 | Normal Ground Erection of 9m, 9.14m Poles | 1 | Loc | 600 ₹600 |
| 7.00 | Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles | 1 | Loc | 690 ₹690 |
| 8.00 | Rocky Ground of Erection of 9m, 9.14m Poles | 1 | Loc | 600 ₹600 |
| 9.00 | Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36" | 1 | Loc | 600 ₹600 |
| 10.00 | Normal Ground of erection of 36" RSJ pole | 1 | Loc | 700 ₹700 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
2 Mar 2026, 2:00 pmClosed
EE
EXECUTIVE ENGINEER , DISTRIBUTION/TENKASI
Execution of Contract towards Extension of supply works For capital, DCW and improvement works through Shenkottai sub-division in Tenkasi Division.
2026_EB_664690_1
EE/TSI / ETW-028/25-26
Open Tender
Electrical and Maintenance Works
90 days
Tenkasi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
5 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Normal ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Excavation of pole pit (1.25m * 0.5m*1.5m) 7.32m, 7.5m, 8m, 8.23m Poles
Rocky ground Erection of 7.32m, 7.5m, 8m, 8.23m Poles
Normal Ground Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Normal Ground Erection of 9m, 9.14m Poles
Rocky Ground of Excavation of pole pit (1.25m * 0.6m*1.83m) 9m, 9.14m Poles
Rocky Ground of Erection of 9m, 9.14m Poles
Normal Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
Normal Ground of erection of 36" RSJ pole
Rocky Ground of Excavation of pole pits (1.25m*0.6m*1.83m) for RSJ pole 36"
Rocky Ground of erection of 36" RSJ pole
Transporting of poles from road side to pole pit -7.32m, 7.5m, 8m, 8.23m Poles
Transporting of poles from road side to pole pit -9m,9.14m RCC/PSC pole
Transporting of poles from road side to pole pit -36" RSJ pole
Loading and Unloading of Poles-7.32m, 7.5m, 8m, 8.23m Poles
Loading and Unloading of Poles-9m,9.14m RCC/PSC pole
Loading Unloading of poles-36" RSJ pole
Loading Unloading of line materials
Concreting of pole as per Board Standards (2'*2'*5'). The material such as sand, jelly, etc., have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.compleat.
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (0.3m * 0.3m * 1.5m) including materials except cement.
Coil earthing per pole & pole earthing
Normal Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (for Stay Set)
Normal Ground -Erection of Stay Set
Rocky Ground-Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For Stay Set)
Rocky Ground -Erection of Stay Set
Fixing of V & Channel Cross Arm 3.5' including transporting of materials from road side to site
Fixing of V & Channel Cross Arm 4.5' including transporting of materials from road side to site
Fixing of 3 phase Cross Arm including transporting of materials from road side to site
Fixing of 1 phase Cross Arm including transporting of materials from road side to site
Fixing of HT LT TI Fitting including transporting of materials from road side to site
Erection of HT side arm with stud including transporting of materials from road side to site
Erection of LT side arm with stud including transporting of materials from road side to site
Fixing of insulator (per location) including transporting of materials from road side to site
Fixing of Tapping/Gaurding Channel X Arm
Fixing of 11kV Strain Disc
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
HT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/4.09 ACSR (1 Span/wire)
For HT line clear works for 7/2.59 ACSR (1 Span/wire)
For HT line clear works for 7/3.35 ACSR (1 Span/wire)
For HT line clear works for 7/4.09ACSR (1 Span/wire)
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/2.59 ACSR (1 Span/wire)
LT lines Stringing , Sagging, binding including transporting of materials from road side to site for-7/3.35ACSR (1 Span/wire)
For LT line clear works for 7/2.59 ACSR (1 Span/wire)
For LT line clear works for 7/3.35 ACSR (1 Span/wire)
Spilt Neutral Guarding
Flat Guarding
Erection of Transformer /Dismantling of 40kVA/Any sectionaliser
Erection of Transformer/Dismantling of 63kVA, 100kVA
Erection of Transformer/Dismantling of 250 KVA
Erection of feeder cable with open type fuse unit per feeder
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Erection of feeder cable Bus bar arrangement with open type
Erection of DT metering
Loading of Distribution transformer below 100kVA
Unloading of Distribution transformer below 100kVA
Loading of Distribution transformer 250KVA
Unloading of Distribution transformer 250KVA
Erection of centre Support ( incl. Concrete)
Plinth Work For DTs upto 250 KVA (1.2mx1.2mx.3m) + (1.2mx1.2mx2m)
Dismantling of Center support
Alteration of clamps
Drilling less than 23 mm holes per hole/slatted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ Pole Cutting
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of service connection materials -Single phase
Erection of service connection materials -Three Phase
Erection of 1*40W tube light complete
Erection street light switching box arrangements
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Dismantling of RSJ poles
Providing jumpering at cut point
Tree clearance in HT or LT location For ordy. Tree clearance and Throng bushes & trees Each Labour /Head/Day
Tree clearance in HT or LT location For coconut Trees and palmrah tree each Labour /Head/Day
Set right of leaning of HT pole including X arms, TI fittings
Set right of leaning of LT pole including X arms, TI fittings
Resagging of Conductor 7/2.59mm
Resagging of Conductor 7/2.59mm with LC
Resagging of Conductor 7/3.35mm
Resagging of Conductor 7/3.35mm with LC
Resagging of Conductor 7/4.09mm
Resagging of Conductor 7/4.09mm
Erection of Tapping Structure ( Double pole) complete as per TNEB standard including painting
Erection of Distribution Transformer double pole Structure complete as per TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
Erection of of 11 KV Single pole Structure including erection of DT complete as per TNEB TNEB standard including painting feeders arrangement colour washing of RCC poles etc fixing of poles type to be unit HT/LT LAS and jumbering 3 nos earth pits with earth trough except erection of distribution Transformer
Dismantling of Stay Set complete including stay rod
Dismantling of Stay set complete Without Stay rod
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearset road side and stocking in coils with LC
Dismantling of conductor of 7/3.35 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of conductor of 7/3.35 including transporting the conductors to the nearset road side and stocking in coils with LC
Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils
Dismantling of conductor of 7/4.09 including transporting the conductors to the nearset road side and stocking in coils with LC
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of V Cross arm
Dismantling of 3 Phase X Cross Arm
Dismantling of Single phase X Cross
Dismantling of HT/LT TI Fitting
Dismantling of HT /LT pin insulators
Dismantling of strain Disc
Painting of Distribution Transformer only
Dismantling of Tapping/Guarding channel X Arm
Providing PA Jumper
Hiring of JCB Upto 2Hours
Hiring of crane Upto 2Hours
Exceeding 1 hour for every Hour
Transporting of charges of DT/line materials using private vehicle upto 20 KM(up and Down)
Beyond 20 KM for every KM
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Spec028.pdf
Tender Documents • 1.28 MB
BOQ_798228.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid