Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹27,209.01 (9.29%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.3 L+₹32,597.46 (11.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.4 L+₹50,149.94 (17.1%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.6 L+₹63,487.69 (21.7%)Admitted-Finance WARD NO 10 SARASWATI CHOWK IRP CHOWK OPP POLICE STATION ROAD REASI | REASI | JAMMU AND KASHMIR | 182301 | L5 | Admitted-Finance |
Tender Value
₹5.3 L
EMD Value
₹10,670
Closing Date
20 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_318465_20
e-NIT No.90 REW UDHAMPUR of 2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹10,670
29 Aug 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : 70% Ordinary Rock 30% | 14 | Sqm | 327.85 | ₹4,589.9 |
| 2 | Hand packed stones in wire crates: excluding cost of crates but including cost of stones | 178 | cum | 1,071.15 | ₹1,90,664.7 |
| 3 | Supply of G I Crates made of Mesh type 10x12 (D=100 mm) | 646 | Sqm | 315 | ₹2,03,490 |
| 4 | Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials | - | Sqm | 92.9 | - |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited ayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 60% Earth | 180 | cum | 218.4 | ₹39,312 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited ayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 40% Stone | 120 | cum | 237 | ₹28,440 |
| 7 | SIGN BOARD | 1 | no. | 7,000 | ₹7,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1049531.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .