| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 L+₹955.08 (0.09%)Rejected-Finance | ₹10.6 L+₹955.08 (0.09%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
28 Jul 2026, 10:30 amClosed
EE RED Shamli
EE RED Office Shamli
02- GRAM LANK MAI BARAT GHAR NIRMAN KARYA
2026_REDUP_1171250_2
299/EERED/TENDER/2026-27/ Dt 24-06-2026
Open Tender
Construction Works
Percentage
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹23,000
19 Sept 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. SI 2.8.1 | 49.67 | CUM | 191.32 | ₹9,502.86 |
| 2 | 1:5:10 (1 cement: 5 fine sand derived from natural ources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) As per S.I. No. 4.1.11 Page 104, V-1 | 14.3 | SQM | 4,549.39 | ₹65,056.28 |
| 3 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in As per S.I. No. 6.2.2 Page 127, V-1 | 21.59 | CUM | 4,626.94 | ₹99,895.63 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement 2 coarse sand (zore-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources As per S.I. No. 5.1.3 Page 113, V-1 | 4.26 | CUM | 6,308.8 | ₹26,875.49 |
| 5 | 12 MM THICK PLASTER IN 1:4 CEMENT AND C/SAND MOTAR IN PLINTH As per S.I. No. 13.1.1 Page 217, V-II | 64.4 | CUM | 255.08 | ₹16,427.15 |
| 6 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt. ) for small works/ Abadi area. (where machine can not move ) (S.I. 1.1.2 PG 83 | 60.31 | SQM | 180.68 | ₹10,896.81 |
| 7 | Brick work with common burnt clay F.P.S. (nori modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: As per S.I. No. 6.4.2 Page 127, V-I | 29.64 | CUM | 6,692.87 | ₹1,98,376.67 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). SI 5.3 | 12.82 | CUM | 8,456.54 | ₹1,08,412.84 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers SI 5.9.5 | 68.08 | CUM | 541.25 | ₹36,848.3 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers SI 5.9.5 | 58.8 | CUM | 541.25 | ₹31,825.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_2198746.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .