Tender ID
Tender Value
₹9.4 Cr
EMD Value
₹18.9 L
Closing Date
6 Mar 2026, 12:00 pmClosed
SE Kanpur Circle PWD Kanpur
SE Kanpur Circle PWD Kanpur
Widening and strengthening work of G.T. road to Ghemau Khajuri via Samhi road(ODR). (Including 05 Years maintenance cost).
2026_CEKNP_1120960_1
835C/131C-KV/2025-26 Dt. 09.02.2026
Open Tender
Civil Works - Roads
Item Rate
365 days
Kanpur Nagar
Please refer tender documents
2 documents required · 2 mandatory
₹7,714
₹18.9 L
Yes
SE Kanpur Circle PWD Kanpur
20 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
3 Mar 2026
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(2.0 km carted Earth)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Compaction Only)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (2.0 km carted Earth)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause Specification no. 406.
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Rates Including Emulsion SS-1
Providing and laying dense graded bituminous macadam with higher capacity batch type 120 TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates Including Bitumen VG-30 (Gr-2)
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.as per MoRTH specification clause No. 503 (Rate including bitumen VG-10)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Grading - II) Rates Including Bitumen VG-30
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Reinforced cement concrete M-15 grade 5th Kilometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc.
Reinforced cement concrete M-15 grade Kilometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc.
Reinforced cement concrete M-15 grade Hectometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump
Supplying, Fitting and Placing HYSD bar Reinforcement in Sub Structure complete as per Drawing and Technical Specifications.
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete.
Drainage spouts complete as per drawing and technical specification clause 1209
Filling brickbats as filler material between roadcrust and abutment
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (1000 mm dia)
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (600 mm dia)
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Lettering and painting of culvert and parapet etc. complete.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising glass beads on bitunimious surface. Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. (Repeated / Tranvers bar) Providing and laying of hot applied thermoplastic compound 5.00 mm thick including reflectorising glass beads @ 500 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35-2015 .The finished surface to be level, uniform and free from streaks and holes.
6 m Span Cantilever Structure with 300 dia M S one vertical post. Supply fixing and Erection of built-up cantilever structure of 6.00m span comprising of one vertical post of 6.00m high made up of 300mm NB heavy class M.S. pipe as vertical member welded with 10mm MS plate at top and 12mm MS plate at bottom. The horizontal truss shall comprise of 50mm dia heavy class MS pipe and 40 mm dia heavy MS pipe as bracing and 10mm MS plate at bottom for fixing to vertical post as per structure design and drawing with one coat of steel primer and two coats of synthetic enamel paint. The work includes construction of RCC foundation of 900X900 mm of required depth as per site condition for built up structure including earth work in excavation ,100mm thick lean concrete in 1:4:8 cement and coarse sand and 40mm gauge stone ballast RCC with hand mixing in 1:2:4 cement coarse sand and 20 mm stone grit including cost of reinforcement ,shuttering and cantering complete as per direction of E/I.
Providing & fixing of reflective signs with a corrosion resistant 4 mm thick aluminium composite panel face to be fully with High Intensity prismatic sheeting type IV as per IRC-67:2010 retro refletive sheeting with MS angle frame of 35x3
Fixing of New Reflective Sign Board, Reflective Caution Boards Stop Board (90 cm high octagon), As per IRC 67:2012
Fixing of New Reflective Sign Board, Reflective Caution Boards. Informatory Board (60 mm x 45 mm rectangular with diffinitation plate (20cm X 60cm) As per IRC 67:2012
Fixing of New Reflective Sign Board, Reflective Caution Boards T- Intersection ( 60 cm equilateral tringle with diffinitation plate (20cm X 60cm), As per IRC 67:2012
Fixing of New Reflective Sign Board, Reflective Caution Boards Abadi Name Board (80 mm x 60 mm rectangular with diffinitation plate (20cm X 60cm), As per IRC 67:2012
Fixing of New Reflective Sign Board, Reflective Caution Boards 30X90 cm (Left/Right) Object Hazard, As per IRC 67:2012,
Fixing of New Reflective Sign Board, Reflective Caution Boards 50X60 cm single chevron,As per IRC 67:2012
Tree Plate Supply&Fixing of Retro reflectiveTree Plate having size15cm x 15cm, consisting Type XI Retro reflective Sheeting fixed Over 1.50 mm thick aluminium sheet including labour, Material T&P etc for proper completion of the work. The rate shall include all materials, labour, T & P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone ( (as per Mentioned in GO No. (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 1st year after completion of work @ Zero % of total work amount of item 1 to 37.
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 2nd year after completion of work @ 0.25 % of total work amount of item 1 to 37..
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 3 rd year after completion of work @ 0.50 % of total work amount of item 1 to 37.
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 .. Maintence of 4 rth year after completion of work @ 0.75 % of total work amount of item 1 to 37.
Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 5 th year after completion of work @ 1.00 % of total work amount of item 1 to 37.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 4.45 MB
BOQ_2085283.xls
BOQ • 0.29 MB
835Ghemau.pdf
PDF • 0.21 MB
1285gtroad.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .