| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-Finance | ₹8.4 L | 1 | Accepted-Finance Responsive |
| Sl No | Description | Qty | Unit | M/s USR Transport L1 |
|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||
| 1.10 | All kinds of soil. | 0.35 | cum | 817 ₹285.95 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||
| 2.10 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.7 | cum | 18,007 ₹12,604.90 |
| 3.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.2 | cum | 23,007 ₹4,601.40 |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||
| 4.10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 2 | sqm | 817 ₹1,634 |
| 5.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | ||||
| 5.10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 16 | kg | 207 ₹3,312 |
| 6.00Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | ||||
Tender Value
₹7.9 L
EMD Value
₹15,806
Closing Date
13 Apr 2026, 3:00 pmClosed
General Manager (CW)
General Manager (CW) Vikas Bhawan, ANIIDCO
Interior Modification of IMFL shop at Campbell Bay
2026_ANCVL_22174_2
ANIIDCO/CW/25-26/TD-25
Open Tender
Civil Works - Buildings
60 days
Campbell Bay
As per tender documents
6 documents required · 6 mandatory
₹0
₹15,806
29 Apr 2026
2 Apr 2026
14 Apr 2026
3 Apr 2026
13 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.1 | All kinds of soil. | 0.35 | cum | - | - | Item 01 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
| 2.1 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | Item 02 |
| 3Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | ||||||
| 4Centering and shuttering including strutting, propping etc. and removal of form for | ||||||
| 4.1 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - | Item 04 |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | ||||||
| 5.1 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - | Item 05 |
| 6Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
tenderdoccampbellbay.pdf
Tender Documents • 1.72 MB
Tendernotice.pdf
Other Documents • 0.41 MB
BOQ_23933.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid