Tender Value
₹2.8 Cr
EMD Value
₹2.9 L
Closing Date
19 Jan 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
Above/Below/Par
GS
17 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, failing which the offer is likely to be rejected without any further reference.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Work :- Supply, installation, testing and commissioning of HT panels/LT panels, cable laying, wiring/rewiring of any building/office in central government or state government or public sector undertakings (also called Public sector Undertakings (also called public sector enterprise)
31 conditions · 7 needing a document upload
Mandate form should be uploaded as per attached format in document tab ( Click here to download Format)
GST: Tenderer has to fulfills GST Compliance as per Govt. norms
Tenderer may upload GST registration number and certificate.
Tenderers will examine the various provisions of the Central Goods and Services Tax Act 2017(CGST) Integrated Goods and Service Tax Act. 2017 (UGST)/respective states Goods and Services TaxAct(SGST)also, as notified by/central/Sate Govt& as amended from time to time and applicable taxes before bidding Tenderer swill ensure that full benefit of Input Tax Credit(ITC)likely to be availed by them is duly considered while quoting rates
Performance Guarantee: As per Indian Railways Standard General Condition of Contract 2022. 16.(4) Performance Guarantee The procedure for obtaining Performance Guarantee is outlined below: (a) The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work. (b) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value:- (i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii) Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x) National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
(c) The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days. (d) The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value. (e) The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. (f) Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed. (g) The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The Contract being determined or rescinded under clause 62 of these conditions.
Security Deposit: As per Indian Railways Standard General Condition of Contract 2022. 16.(1) Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
16.(2) (i) Refund of Security Deposit: Security Deposit mentioned in sub clause (1) above shall be returned to the Contractor along with or after, the following: (a) Final Payment of the Contract as per clause 51.(1) and (b) Execution of Final Supplementary Agreement or Certification by Engineer that Railway has No Claim on Contractor and (c) Maintenance Certificate issued, on expiry of the maintenance period as per clause 50.(1), in case applicable. 16. (2) (ii) Forfeiture of Security Deposit: Whenever the contract is rescinded as a whole under clause 62 (1) of these conditions, the Security Deposit already with railways under the contract shall be forfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of these conditions, the Security Deposit shall not be forfeited. 16.(3) No interest shall be payable upon the Bid Security and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of Sub-Clause 16.(4) (b) of this clause will be payable with interest accrued thereon.
Mention status of firm: Individual Firm / Proprietorship Firm / Partnership Firm /Private Ltd. Firm / Public Ltd. Firm OR Government Undertaking.
Submission of Document Verification Certificate Please submit a certificate in the prescribed format (please download the format from the link given below) for verification / confirmation of the documents submitted for compliance of eligibility / qualifying criteria. Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. (Format of Self Certification attached in document tab ( Click here to download Format)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Guarantee/Warrantee: The installation will be handed over to the Department after necessary testing and commissioning. The installation will be guaranteed against any defective design/ workman-ship. Similarly, the materials supplied by the contractor will be guaranteed against any manufacturing defect, inferior quality. The complete luminaire/LED bulb shall have replacement guarantee for satisfactory performance and manufacturing defects for a period of 60 months from the date of commissioning or 72 months from the date of supply whichever is earlier. For switch gear components and panels, warrantee should be 1year after date of installation , For all other items, the warrantee period will be for a period of 12 months from the date of handing over to the Department. Installation/ equipment or components thereof shall be rectified/repaired to the satisfaction of the Engineer-in-charge
Shramikkalyan portal:- (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54,55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment inthis portal. These details shallbe available in public domain. The registration /updation in Portal shall be done as under: (a)Contractor shall apply for one time registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LoAs)issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoAs)/ Contract Agreements on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d)After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating ofeach wage payment to them on shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii)While processing payment of any'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till____Month,____Year.
Please read the Explanatory note for detail description of work, their make etc and all other attached documents before submission of Tender.
Any other reputed make/ brand other than as mentioned in the explanatory note may be included during the execution of the works on an urgent basis/as per direction when needed with approval of competent authority.
"Compliance to Regulations and Bye-Laws [GCC Clause 3.(2)] Statutory requirement of " valid Electrical Contractor License along with valid Electrical Supervisory License/Certificate issued from Central Govt./any Sate Govt. for the working voltage related to the work valid throughout the contract period" is also applicable for execution of the works by successful bidder in addition to the Statutory requirements as applicable.
Upgradation/Modernization of goods shed at Sankrail Goods terminal
Elect-Chg-25-26-SGTY~SER
Elect-Chg-25-26-SGTY
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹2.9 L
19 Jan 2026
24 Dec 2025
5 Jan 2026
290 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 44,82,991.3 | ||
| — | 70.00 | — | — | ||
| Concealed Wiring of light and fan point by 1.5 Sq mm PVC CU wire with 1 Sq mm Earthing wire through PVC conduit pipe with 6A oneway modular switches including supply of all required materials with suitable flush metal boxes with front plate,. The plate should include 2 blank space for further installation of switches. Cable would be FRLS type. Make of Modern Switch/Socket/Plate/Box: Goldmedal/Havells/Polycab/Honeywell Make of Cable: Havells/KEI/Polycab/Finolex/ APAR Make of PVC Condit Pipe: Kalinga/Presto plast/ Precision/AKG | — | — | — | 36,346.1 | |
| — | 250.00 | — | — | ||
| "Concealed Sub circuit wiring by 2.5Sq mm PVC wire with 1Sq mm earthing wire of PVC CU wire through 20 mm dia PVC conduit pipe with Supply of PVC Circular Box and Ceiling rose if required with connection from running circuit as per direction of Consignee. The cost includes supply of all materials to complete job. Cable would be FRLS type. Make of Cable: Havells/KEI/Polycab/Finolex/RR Kabel/RPG Cables/APAR Make of Circular Box and Ceiling rose: Goldmedal/Havells/Polycab/HPL/Kinjal/Honeywell Make of PVC Condit Pipe: Kalinga/Presto plast/ Precision/Akg/Balco/UNIVERSAL" | — | — | — | 21,842.5 | |
| — | 200.00 | — | — | ||
| "Concealed Sub circuit wiring by 4 Sq mm PVC wire with 2.5 Sq mm earthing wire of PVC CU wire through 20 mm dia PVC conduit pipe . The cost includes supply of all materials to complete job. Cable would be FRLS type. Make of Cable: Havells/KEI/Polycab/Finolex/RR Kabel/RPG Cables/APAR Make of PVC Condit Pipe: Kalinga/Presto plast/ Precision/Akg/Balco/UNIVERSAL" | — | — | — | 24,372 | |
| — | 60.00 | — | — | ||
| "Concealed Sub circuit wiring by 6 Sq mm PVC wire with 2.5 Sq mm earthing wire of PVC CU wire through 20 mm dia PVC conduit pipe . The cost includes supply of all materials to complete job. Cable would be FRLS type. Make of Cable: Havells/KEI/Polycab /Finolex/RR Kabel/RPG Cables/APAR Make of PVC Condit Pipe: Kalinga/Presto plast/ Precision/AKG" | — | — | — | 7,428.6 | |
| — | 30.00 | — | — | ||
| "Point Wiring by PVC conduit /PVC Casing & Capping : -- Internal wiring for light, fan , plug points and night lamp points by 1.5 sq.mm Cu. FRLS cable, 660 Volt grade, Make of Cable: Polycab /Finolex / Havells/KEI/ APAR/RR Kabel/RPG Cable through PVC conduit pipe of (25 mm dia a n d 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm), Make of PVC Condit Pipe: Polycab/AKG/Presto plast/ Precision and piano type switches, batton holder, ceiling rose, sockets to be provided as and where required as per direction of consignee on phenolic covered switch board of suitable size with continuous earthing by 14 SWG tinned Cu. wire / by 1 Sq.mm PVC Cu wire (Provision of fan regulator should be kept on switch board) *Each switch board should contain flash type fuse of 5A capacity. *All switches, batton holder, ceiling rose, 5A socket etc. will be make of L&T/Havells/Polycab/HPL conforming to IS approved reputed brand.( Two 5-ampere socket point treated as one point),Two blank space is required in each modular switch board." | — | — | — | 11,460.6 | |
| — | 100.00 | — | — | ||
| "Circuit/Sub-circuit wiring by PVC conduit/PVC casing capping wiring by 2.5 sq.mm Cu. FRLS cable, 660 Volt grade Make of Cable: Polycab /Finolex / Havells/KEI/APAR/RR Kabel/RPG Cable through PVC conduit (25 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm) Make of PVC Condit Pipe: Polycab/AKG/Presto plast/ Precision and continuous earthing by 14 SWG tinned Cu. wire/1 Sq. mm PVC Cu. wire to be provided as and where required as per direction of consignee. *Quantity per meter means-one meter conduit with 2 (two) meters Cu. cable & 1mtr of 14 SWG tinned Cu. wire/1.5Sq.mm PVC Cu. as earthing with Supply of PVC Circular Box and Ceiling rose with connection 1.5 Sq.mm PVC wire from running circuit ( 2.5 Sq.mm PVC wire) as per direction of Consignee. " | — | — | — | 5,724 | |
| — | 50.00 | — | — | ||
| Circuit/Sub-circuit wiring by PVC conduit/PVC casing capping wiring by 4 sq.mm Cu. FRLS cable, 660 Volt grade make-Polycab /Finolex / Havells/KEI/APAR/RR Kabel/RPG Cable through PVC conduit (25 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm) make- Kalinga/Presto plus/Precission and continuous earthing by 14 SWG tinned Cu. wire/2.5 Sq. mm PVC Cu. wire to be provided as and where required as per direction of consignee . *Quantity per meter means-one meter conduit with 2 (two) meters Cu. cable & 1mtr of 14 SWG tinned Cu. wire. | — | — | — | 3,174 | |
| — | 1500.00 | — | — | ||
| Laying of cable / cables in under ground along the road through cable trench etc . as per standard drawing including necessary termination , connection and testing.Trenching and laying of U/G cables in any kind of soil trench of size minimum 0.40 mtr wide and 1 mtr deep covered with necessary bricks for protection of the cables including filling of space between brick and cable/cables with sand and refilling the trench with excavated soil, leveling up, and restoring the surface duly rammed. | — | — | — | 1,93,035 | |
| — | 400.00 | — | — | ||
| Laying of cable / cables across the road, track, drain etc through RCC/GI pipe confirming to IS standard of size 100mm or 150mm (or any suitable size as per field requirement based on the actual size of the cable) as per relevant specification and as per standard drawing with necessary termination, connections and testing .Cost also includes collection of cable/cables from Railway store if required.GI pipe will be supplied by contractor. | — | — | — | 1,17,836 | |
| — | 100.00 | — | — | ||
| Laying of cable/ cables on wall / structure through PVC casing pipe of size 4inches or 3inches with accessories or as per site requirement with suitable clamp / saddle/ fixtures etc with necessary termination, connection and testing as per standard drawing.Cost also includes collection of cable/cables from Railway store if required. | — | — | — | 8,850 | |
| — | 1000.00 | — | — | ||
| Boring/Punching of underground crossing track with pipe pushing by HDD/manual technology for crossing HT/LT power cable below the railway track/road including jointing of HDPE Pipe etc. | — | — | — | 15,34,990 | |
| — | 6.00 | — | — | ||
| Transportation of cables in rolls with or without wooden drums from the store of concerned SSEE or any store of kharagpur to the site of works. | — | — | — | 6,072.48 | |
| — | 400.00 | — | — | ||
| "Supply of HDPE pipe of size 4 inch or more i.e 110 mm Diameter PE 100 to complete job. Make-Any IS/ISO Approved." | — | — | — | 1,06,000 | |
| — | 400.00 | — | — | ||
| Erection and commissioning of HDPE pipe with all accessories to complete job. | — | — | — | 16,396 | |
| — | 50.00 | — | — | ||
| "Supply of Flameproof , Explosion proof cum weatherproof fluorescent luminaires: 2 x 20 watt LED light 240 volt AC; wall/ceiling mounted that are manufactured in rigid enclosure of light metal aluminium alloy and with a clear tubular glass. The control gear chamber mounted by means of socket screws is at one end and a lamp replacement cover is provided at the other end. it should be specifically designed spring loaded bi-pin holders for shock absorp- tion and effective holding of the lamp. Suitable gaskets are provided for weather proof/ingress protection. Apparatus standard should be IEC 60079-0 or latest | — | — | — | 10,96,220 | |
| — | 50.00 | — | — | ||
| Fixing and Commisioning of Flameproof , Explosion proof cum weatherproof fluorescent luminaires: 2 x 20 watt tube light 240 volt AC | — | — | — | 27,405.5 | |
| — | 2.00 | — | — | ||
| Supply of 125A ,35-36kA Four Pole Microprossesor based MCCB with sheet steel enclosure, spreader link and other proper wiring to complete job. | — | — | — | 22,360 | |
| — | 2.00 | — | — | ||
| Fixing and commissioning of 125A ,35-36kA Four Pole Microprossesor based MCCB with sheet steel enclosure, spreader link and other proper wiring and necessary item as per site requirement to complete job. | — | — | — | 1,372.94 | |
| — | 2.00 | — | — | ||
| "Supply,Fixng and Commissioning of Digital Timer(Astronomical/24Hr) Panel for Street Light Control etc., Floor/Panel/Tower/Wall mounted consisting of 3 Phase, Max Load: 6-18KW, Auto /Manual switch, Digital 24 Hour Timer, Contactor Rating (A): 65A TP or suitable, MCB Rating: 63A TPN as incoming, 16/20A SP 10kA MCB as outgoing with provision of pad lock. | — | — | — | 36,360 | |
| — | 30.00 | — | — | ||
| "Supply of 20W or higher wattage LED tube light with Batten ( integrated electronic driver).As per CEGE approved Specification for LED tube light-high power,2100 Lumen output,220V, 50Hz AC with constant current driver with short circuit and overload protection etc. | — | — | — | 12,360 | |
| — | 30.00 | — | — | ||
| Fixing and Commisioning of 20W or higher wattage LED tube light with Batten | — | — | — | 1,437 | |
| — | 10.00 | — | — | ||
| Supply, of LED Street light fittings 45W LED, LED chip Efficacy 130 Lm/Watt, IP-66. Light should be as per HQ specification. | — | — | — | 15,000 | |
| — | 10.00 | — | — | ||
| Fixing and commissioning of LED Street light fittings 45 W LED, IP-66. | — | — | — | 1,500 | |
| — | 4.00 | — | — | ||
| Supply of Exhaust Fans 300 mm , 1400 RPM suitable for 230V, 50Hz, AC supply, Conformity to Indian Standrad IS: 2312 (latest).accessories such as Frame, Legs Set,Rubber Clamps & Other Hardware - inclusive in the scope of supply. | — | — | — | 10,708 | |
| — | 4.00 | — | — | ||
| Fixing and commissioning of Exhaust Fans as per consignee requirement. | — | — | — | 611.48 | |
| — | 6.00 | — | — | ||
| "Supply of 3 modular plate and metal box with 6A/16A twin socket Shutter type and 16 or 20A switch. All item will be modular type and separate (as per PCEE specification no.CEE/P/56/301 /MAINTENANCE, Dtd. 17/11/2022.) | — | — | — | 2,730 | |
| — | 6.00 | — | — | ||
| Fixing and commissioning of 3 modular plate and metal box with 6A/16A twin socket Shutter type and 16 or 20A switch. All item will be modular type and seperate. (Wiring will be covered under Shedule item No.14 as per site requirement). | — | — | — | 190.8 | |
| — | 6.00 | — | — | ||
| Supply o f modular PC Board(consealed as per requirement) consisting with 07 nos switch, 02 nos socket, 01 nos electronic regulator and internal wiring.with 18M GI min Box size 210 mm x 135 mm x 50 mm | — | — | — | 4,401.24 | |
| — | 6.00 | — | — | ||
| Fixing and commissioning of modular PC Board(consealed as per requirement) consisting with 07 nos switch, 02 nos socket, 01 nos electronic regulator and internal wiring.with 18M GI min Box size 210 mm x 135 mm x 50 mm. Make: Anchor/Crabtree. | — | — | — | 440.1 | |
| — | 1.00 | — | — | ||
| "Supply of LT Panel consisting of FP 400A 50kA Microprocessor Based MCCB-02 Nos as incoming and FP 200A 35kA Microprocessor Based MCCB-03 Nos, FP 63A 35kA Microprocessor Based MCCB-02 Nos and 63A,10kA DP 2PP MCB-02nos as outgoing with Voltmeter, Ammeter, LED indicator lamp, Cu. Bus Bar , neutral link, earth bar, spreader link, Lock and key feature arrangement cable gland etc.. with suitable sheet steel enclosure to complete the job with proper connection. | — | — | — | 3,03,602.83 | |
| — | 1.00 | — | — | ||
| Fixing and commissioning of LT Panel consisting of FP 400A 50kA Microprocessor Based MCCB-02 Nos as incoming and FP 200A 35kA Microprocessor Based MCCB-03 Nos, FP 63A 35kA Microprocessor Based MCCB-02 Nos and 63A,10kA DP 2PP MCB-02nos as outgoing with Voltmeter, Ammeter, LED indicator lamp, Cu. Bus Bar , neutral link, earth bar, spreader link, Lock and key feature arrangement cable gland etc.. with suitable sheet steel enclosure to complete the job with proper connection. | — | — | — | 2,977.93 | |
| — | 3.00 | — | — | ||
| — | — | — | 25,827 | ||
| — | 3.00 | — | — | ||
| — | — | — | 1,725.87 | ||
| — | 800.00 | — | — | ||
| — | — | — | 7,04,212.76 | ||
| — | 40.00 | — | — | ||
| — | — | — | 41,181.33 | ||
| — | 2.00 | — | — | ||
| — | — | — | 18,900 | ||
| — | 4.00 | — | — | ||
| — | — | — | 6,166.64 | ||
| — | 4.00 | — | — | ||
| Erection of Earthing arrangement with commissioning of earth cone and all other requisite materials as per CEE/GRC's Drg. No.CEE/G/A-3/P-150 including sump box with salt and charcoal,metalic cover etc.Cost also includes connection of 35X3 SWG GI strip between earth pole and main switch/DB/Rail pole etc. as per site supervisor's instruction. Cost also includes connection of earth clamp of size 50X6mm GI and testing of earth resistance. | — | — | — | 3,153.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .