Executive Engineer TED
OFFICE OF THE EXECUTIVE ENGINEER TAKDAH ENGINEERING DIVISION 6TH MILE NAYA BUSTY, DARJEELING
Package 6 Recovery and reconstruction of road at Different location at Mungpoo Labdah Samasty under Takdah Engineering Division, GTA
2026_GTA_995554_6
GTA/EE/TED/NIeT-15(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
270 days
Takdah
As per NIeT
4 documents required · 4 mandatory
₹0
₹3.3 L
Yes
2 Jun 2026
29 Jan 2026
23 Feb 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
(A) REOVERY AND RECONSTRUCTION OF ROAD FROM KATUWAL GOLAI TO MANAGERS OFFICE,MUNGPOO, UNDER TAKDAH ENGINEERING DIVISION Clearing and Grubbing Road Land: Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. (I) By manual means a) In area of non-thorny jungle
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.)
Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with disposal upto 1000 metres Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to mbankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of easurement: pre works and post works
Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works)
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
Surface Finish Works Compacting Original Ground A. Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Clause 305.3.4 of Specifications for Road & Bridge Works of oRT&H (5th Revision).
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Supplying of Boulders at quarry sites including carriage upto work site
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (c) M-25 Grade
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iii) On Cement concrete pavement (Using Bitumen emulsion at the rate of 0.30 to 0.35 kg per sqm.)
Protective work. Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering (B) In ground floor (with N.B. Variety Stone metal) (a) (1:4:8) proportion P.C.C (1:4:8)
Plum Concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any (i) (1:3:6) proportion
Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates /river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. A) Granular Material
Providing weep holes in Brick masonry/ plain/ reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1v:20H towards drawing face. Complete as per drawing and technical specifications.
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site (a) In Road and Jhora Work
CULVERT & C.D Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring 1.50 span
CULVERT & C.D Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring 2.00 span
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. 1.50 spaN
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. 2.00 spaN
I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering (B) In ground floor (with N.B. Variety Stone metal) (a) (1:4:8) proportion 1.50 SPAN
I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering (B) In ground floor (with N.B. Variety Stone metal) (a) (1:4:8) proportion 2.00 SPAN
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. (I)1:3:6) Proportion 1.50 Span
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. (I)1:3:6) Proportion 2.00 Span
CULVERT & C.D Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring 3.00 span
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Supply of Boulder at Quarry siite inculding carrage upto work site
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-15 Grade
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. 2.00 spaN
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. (I)1:3:6) Proportion
Plaster with sand & cement motar including rounding of corners or chamfering corners as directed and including raking out joints 15mm th.plaster in 4:1 cement motar 10 mm thick
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
CROSS DRIN Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering (B) In ground floor (with N.B. Variety Stone metal) (a) (1:4:8) proportion
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. (I)1:3:6) Proportion
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Supply of Boulder at Quarry siite inculding carrage upto work site
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (a) M-15 Grade
lain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. RCC Grade M25 ) Using concrete mixer
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
Plaster with sand & cement motar including rounding of corners or chamfering corners as directed and including raking out joints 15mm th.plaster in 4:1 cement motar 10 mm thick
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Providing weep holes in Brick masonry/ plain/ reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1v:20H towards drawing face. Complete as per drawing and technical specifications.
Road Furniture Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-inCharge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). i) 600 mm equilateral triangle
B Recovery and Reconstruction of road from Chhyarchhyary khola to Gopal dhura road,mungpoo Earthwork in cutting to form road section in corect profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (mode of measurement: pre work and post work) (iii) In mixed hard soil (i.e hard moorum and soil containing laterite and boulders which do not require blasting)
Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made on the basis of measurement of finished quantity of work) b) With earth obtained by fresh excavation (including cost of excavation upto 1.800 mm depth) from land.
I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering (B) In ground floor (with N.B. Variety Stone metal) (a) (1:3:6) proportion
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any. (I)1:3:6) Proportion
Ordinary Cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes.24.423 (ii ) River Bazree
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge.
Add 18 % GST
Add 1 % Laboaur Cess
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.70 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_2436409.xls
BOQ • 0.31 MB
TenderForm6.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .