Tender Value
₹83,400
EMD Value
₹4,170
Closing Date
7 Sept 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
construction of culvert with repairement of drain near the land of Mohammad Jaffar ganaie and others at Budina
2026_RDPR_321979_38
NIT_55_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹4,170
24 Aug 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil, with disposal lead upto 1 m from cutting edge | 1.91 | Cum | 479.3 | ₹915.46 |
| 0_) | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones. | 3.31 | Cum | 1,105.35 | ₹3,658.71 |
| 0_) | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 4.26 | Cum | 5,733.6 | ₹24,425.14 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 22.17 | Sqm | 286.35 | ₹6,348.38 |
| 0_) | 12 mm thick pluster in 1:6 mix cement mortar | 29.93 | Sqm | 266.2 | ₹7,967.37 |
| 0_) | Providing and laying in position M-15 grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.43 | Cum | 7,104.8 | ₹10,159.86 |
| 0_) | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto/above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 178.75 | Kg | 115.35 | ₹20,618.81 |
| 0_) | Carriage of Stone aggregate for 20 km | 6.2 | Cum | 409.94 | ₹2,541.63 |
| 0_) | Carriage of Sand for 10 km | 2.92 | Cum | 279.04 | ₹814.8 |
| 0_) | Provision of sign board and Photographs ,carriage of cement,steel ,clearance ofsite BWO removal of RCC spun pipes and other unforeseen items | 1 | No | 5,942.84 | ₹5,942.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_1077016.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].