| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | ₹6.1 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical NIL NEAR BPCL PETROL PUMP MAKARPURA MANEJA VADODARA GUJARAT 390014 | VADODARA | GUJARAT | 390014 | - | - | Rejected-Technical Not fulfilled the PQR |
| Sl No | Description | Qty | Unit | Shri Ram Transformer and Switchgears L1 | M/s Anant Transformers L2 |
|---|---|---|---|---|---|
| 1.00Maintenance and repair Cost (Part-1) | |||||
| 1.01 | Labour charges for fabrication & assembly of coils (set) | 1 | No | 42,000 ₹42,000 | 45,000 ₹45,000 |
| 1.02 | Labour charges for painting and cleaning of tank body & other accessories including paint (set) | 1 | No | 22,000 ₹22,000 | 25,000 ₹25,000 |
| 1.03 | Testing and commissioning charge (at site placing on plinth plus erection, testing & commissioning) (set) | 1 | No | 43,000 ₹43,000 | 45,000 ₹45,000 |
| 2.00Material Charges (Part-2) | |||||
| 2.01 | HV and LV copper Coils (After deducting the cost of retained scrap) | 540 | Kgs | 425 ₹2.3 L | 480 ₹2.6 L |
| 2.02 | Complete Insulation with other material for Transformer (i.e. copper lugs,Gaskets,oil seals,Brazing rod,Washers & creep Paper roll Insulation etc.) | 1 | Set | 42,000 ₹42,000 | 48,000 ₹48,000 |
| 2.03 | Complete HV Bushing with copper leads & other Accessories (17.5 KV/1000 A) (if required) | 3 | Nos | 18,000 ₹54,000 | 22,000 ₹66,000 |
| 2.04 | Complete LV Bushing with copper leads & other Accessories (1.1 KV/2000 A) (If required) | 4 | Nos | 27,000 ₹1.1 L | 30,000 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹11,660
Closing Date
9 Feb 2026, 11:00 amClosed
Superintending Engineer
Room no. 203, Service Building, KaTPP, Jhalawar
CONTRACT FOR REPAIR OF 750 KVA, 11KV/433V, OIL FILLED VOLTAMP MAKE TRANSFORMER OF KATPP, RVUNL, JHALAWAR
2026_RRVUN_534069_1
TN 685
Open Tender
Electrical Works
365 days
Kalisindh Thermal Power Project
As per section G of Tender Document
3 documents required · 3 mandatory
₹590
Sr. AO, KaTPP
₹11,660
25 Apr 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
Maintenance and repair Cost (Part-1)
Labour charges for fabrication & assembly of coils (set)
Labour charges for painting and cleaning of tank body & other accessories including paint (set)
Testing and commissioning charge (at site placing on plinth plus erection, testing & commissioning) (set)
Material Charges (Part-2)
HV and LV copper Coils (After deducting the cost of retained scrap)
Complete Insulation with other material for Transformer (i.e. copper lugs,Gaskets,oil seals,Brazing rod,Washers & creep Paper roll Insulation etc.)
Complete HV Bushing with copper leads & other Accessories (17.5 KV/1000 A) (if required)
Complete LV Bushing with copper leads & other Accessories (1.1 KV/2000 A) (If required)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_951706.xls
BOQ • 0.28 MB
TD685.pdf
Tender Documents • 14.71 MB