Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹18.6 CrAWARDED | ₹18.6 Cr | AWARDED |
Tender Value
₹17.7 Cr
EMD Value
₹17.7 L
Closing Date
2 Apr 2025, 11:00 pmClosed
Karnataka Urban Water Supply and Drainage Board
Improvements of water supply system to Narasimharajapura town under AMRUT 2.0 (Tranche-3) including Operation & Maintenance for a period of 5 years (including 1year DLP) through Design, Build, Operation and Transfer (DBOT) mode. (Lumpsum tender -No Variation)
165615
KUWSDB/2024-25/WS/WORK_INDENT316
Open
Water supply/sewage lines
KUWSDB Chief Engineer Revenue zone Mysuru
₹7,500
₹17.7 L
4 Mar 2025
4 Mar 2025
5 Apr 2025
19 Mar 2025
20 Mar 2025
Improvements of water supply system to Narasimharajapura town under AMRUT 2.0 (Tranche-3) including Operation & Maintenance for a period of 5 years (including 1year DLP) through Design, Build, Operation and Transfer (DBOT) mode. (Lumpsum tender -No Variation)
Raw water open Channel : Conducting topographical survey in the river to identify the lowest bed level to draw water from river, design and construction of 3.0m wide RCC Open Channel in the river incl...
Jackwell cum pumphouse & Elevated transformer yard with 3.5mtr wide approach bridge : Conducting topographical survey in river bank, design and construction of 6.0m dia, 13.00m depth Jackwell and 8.0...
Extension of 11 KV over head line from Existing MUSS to proposed JW : Providing dedicated 11KV express feeder main to Headworks from Existing MUSS and arranging additional power supply from existing 1...
Raw water pumping machineries : Design, Supply, Erection, Electrification, Testing & Commissioning at site brand new best efficient, reputed make deep well vertical turbine pump with 100% standby of ...
Raw water rising main : Conducting topographical survey, design and providing & laying 200mm dia DI K-9 raw water rising main from Jackwell to WTP for a length of 14.90Km including providing RCC ancho...
Water Treatment plant : Conducting topographical survey, design and renovation/ upgradation of 1.20 MLD capacity WTP to 1.46 MLD Rapid sand water treatment plant consists of replacement of 90 degree V...
Construction of 8.0mX6.0m size Pump House @ WTP : Conducting topographical survey, design and construction of 8.0 x 6.0m size RCC frame structure for pump house at WTP premises and any other works r...
Construction of 1.0LL capacity Sump @ WTP : Conducting topographical survey, design and construction of 1.0LL capacity RCC frame structure for sump at WTP premises and any other works required as di...
Pure water pumping machineries : Design, Supply, Erection, Electrification, Testing & Commissioning at site brand new best efficient, reputed make deep well vertical turbine pump with 100% standby of ...
Pure water rising main : Conducting topographical survey, design and providing & laying 150mm dia DI K-9 Pure water rising main from Water Treatment Plant to Service reservoirs for a length of 0.50Km ...
Service reservoir : Design and construction of 1 no. of 2.5 lakh litres capacity RCC service reservoir (OHT shaft type) at DMA-3 near tahsildar office to proposed distribution network and any other ...
Distribution network : Conducting topographical survey, design, Providing, laying, jointing, testing and commissioning of comprehensive 75mm dia to 200mm dia HDPE Distribution system for a length of...
Providing 1750 nos. of House service connections.
Conducting household survey in Town Municipal limits to identify beneficiaries and installation of 1750 Nos. of House Service Connections along with S...
Supply, Installation and Commissioing of SCADA for bulk water meter and cloud based online monitoring system including fixing of Electromagnetic Bulk flow meters at jackwell, at inlet of WTP and at i...
Operation & Maintenance for 5 Years excluding energy charges (Part B)
O & M excluding energy charges for 1st year (Including Defect Liability Period) of Headworks, Raw water rising main, WTP, lead off...
O & M excluding energy charges for 2nd year (Including Defect Liability Period) of Headworks, Raw water rising main, WTP, lead off line, Pumping machineries, all electrical & electromechanical equipme...
O & M excluding energy charges for 3rd year (Including Defect Liability Period) of Headworks, Raw water rising main, WTP, lead off line, Pumping machineries, all electrical & electromechanical equipme...
O & M excluding energy charges for 4th year (Including Defect Liability Period) of Headworks, Raw water rising main, WTP, lead off line, Pumping machineries, all electrical & electromechanical equipme...
O & M excluding energy charges for 5th year (Including Defect Liability Period) of Headworks, Raw water rising main, WTP, lead off line, Pumping machineries, all electrical & electromechanical equipme...
Download all tender documents and submit your bid