| 1 | L1₹3.5 LAccepted-AOC MAIN ROAD KATHARA BOKARO JH | BOKARO | BOKARO | JH | ₹3.5 L Quoted ₹3.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical KATHARA BOKARO JHARKHAND | BOKARO | JHARKHAND | 829116 | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | M/S TRADCO TRADING AND CO L1 |
|---|---|---|---|---|
| 1.01 | (A) Repairing of Pump Upper & lower Pump body Casing and modification of new base plate Peerless Pump 800GPM, Sl. No. JWSP-08, Konar intake Dismantling of Pump body upper & lower | 1 | Set | 7,200 ₹7,200 |
| 1.02 | C.I. Welding electrodes | 14.5 | Kg | 2,800 ₹40,600 |
| 1.03 | HT stud new making & casing 16mm x 75mm | 26 | Nos. | 450 ₹11,700 |
| 1.04 | Providing Steem jointing kit 16mm for casing | 2 | Kg | 3,350 ₹6,700 |
| 1.05 | Repairing and modification of new base plate Dismantling of base plate labour cost
a) Welder = 01 x 02 shift x 3 days | 6 | Manpower | 760 ₹4,560 |
| 1.06 | Dismantling of base plate labour Cost
a) Helper = 2 x 2 shift x 03 days | 12 | Manpower | 541 ₹6,492 |
| 1.07 | Modification / repairing of base plate labour cost
a) Welder = 1 x 2 shift x 03 days | 6 | Manpower | 760 ₹4,560 |
| 1.08 | Modification/ repairing of base plate labour cost
Helper 2 x 2 Shift x 3 Days | 12 | Manpower | 541 ₹6,492 |
| 1.09 | Modification / repairing of base plate labour cost
b) Fitter = 01 x 01 shift x 03 days | 3 | Manpower | 760 ₹2,280 |
| 1.10 | Grinding Charge | 2 | Days | 780 ₹1,560 |
Tender Value
₹3.5 L
EMD Value
₹4,500
Closing Date
18 Mar 2026, 5:00 pmClosed
Project Engineer (EnM), Jarangdih Colliery
Project Engineer (EnM), Jarangdih Colliery
Repairing of (A) Repairing of Pump Upper and lower Pump body Casing and modification of new base plate Peerless Pump 800GPM, Sl. No. JWSP-08, Konar intake (B) Repairing and overhauling of Peerless Pump, 300GPM,100M Head, Sl. No. JWSP-06, New Filter P
2026_CCL_355986_1
PE(EnM)/JRD/E-Tender/25-26/43 Dated 09.03.2026
Open Tender
Electrical and Maintenance Works
10 days
P.E. (EnM), Office of the PO, Jarangdih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,500
28 Apr 2026
9 Mar 2026
19 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
9 Mar 2026 - 16 Mar 2026
(A) Repairing of Pump Upper & lower Pump body Casing and modification of new base plate Peerless Pump 800GPM, Sl. No. JWSP-08, Konar intake Dismantling of Pump body upper & lower
C.I. Welding electrodes
HT stud new making & casing 16mm x 75mm
Providing Steem jointing kit 16mm for casing
Repairing and modification of new base plate Dismantling of base plate labour cost a) Welder = 01 x 02 shift x 3 days
Dismantling of base plate labour Cost a) Helper = 2 x 2 shift x 03 days
Modification / repairing of base plate labour cost a) Welder = 1 x 2 shift x 03 days
Modification/ repairing of base plate labour cost Helper 2 x 2 Shift x 3 Days
Modification / repairing of base plate labour cost b) Fitter = 01 x 01 shift x 03 days
Grinding Charge
Base plate hole making
Cutting of M S plate 20mm and pipe 6” dia Pipe as per requirement
Welding of M.S. plate 20mm and pipe 6” dia pipe as per requirement
Fitting Charge for Sl. No. 1 to 4 @ 10%
(B) Repairing and overhauling of Peerless Pump, 300GPM,100M Head, Sl. No. JWSP-06, New Filter Plant Impeller C.I. LHS
Impeller C.I. RHS
Shaft sleev bush
Bearing housing
Lantern ring Gun metal
Inter stage bush Gun Metal
Neck ring C.I.
Copuling 10" Motor end & Pump end
Steel Shaft EN9
Fitting Charge for Sl. No. 1.15 to 1.23 @ 10%
(C) Repairing and overhauling of 4UP3 Pump, 380GPM, 40M Head, Sl. No. JWSP-03, New Filter Plant Lantern Ring G M
Impeller C I
Shaft sleeve bush CI
Stoffing Box Bush
Steel Shaft EN9
Coupling CI 8” motor end & pump end
Check Nut
Steem Jointing 16mm
Body bolt 16mm x 60mm
Fitting Charge for Sl. No. 1.25 to 1.33 @ 10%
(D) Repairing and overhauling of 4UP3 Pump, 380GPM, 40M Head, Sl. No. JWSP-10, New Filter Plant Neck ring C.I.
Bearing housing
Bearing 6306
Steel Shaft EN9
Impeller C I
HT stud 16mm x 60mm for body
Gland Split
Chappa (block cover)
Shaft Sleev bush C.I.
Fitting Charge for Sl. No. 1.35 to 1.43 @ 10%
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
BOQ_368834.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid