Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-Finance | ₹32.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹33.1 LRejected-Finance | ₹33.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹33.8 LRejected-Finance | ₹33.8 L | L3 | Rejected-Finance L3 |
| 4 | L4₹34.1 LRejected-Finance | ₹34.1 L | L4 | Rejected-Finance L4 |
Tender Value
₹44.3 L
EMD Value
₹88,700
Closing Date
22 Jan 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and fixing direction board and RCC TEE (pocket -5B,5C) for plots in sector -18, YEA,WC-01
2026_YEIDA_1105538_5
YEA/GM(PROJECT)/2025/453 DT-09/01/2026
Open Tender
Civil Works
365 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,040
₹88,700
23 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
Excavation in foundation in ordinary soll (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete UPPWD/SOR/251a/P-14
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion off 8:4:1 including supply of all materials, labour Tools & plants etc required for proper completion of the workBased on UPPWD SOR/2020
Providing, hoisting and fixing up to floor five level precast reinforced cement concrete in small lintels not exceeding 1 5m clear span up to floor five level including the cost of required centering, shuttering and finishing smooth with 6 mm thick cement plaster 1:3 (1 cement: 3 fine sand) on exposed surfaces but excluding the cost of reinforcement with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size).DSR 18/4.1.8
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above Plinth Level.Thermo-Mechanically Treated bars Based on UPPWD SOR/2020. DSR/18/5.22.6
Centering and shuttering including strutting, propping etc. and removal of 5 form for:Columns, Pillars, Piers, Abutments, Posts and Struts.Based on DSR 18/5.9.6
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work. DSR 18/13.61.1
Painting Letters upto 2.5cm size including supply of all material, Labour and tools and plants etc required for proper completion of the work. SOR /2020/21.02/817 ch 11 DSR 18/13.71.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
5.pdf
Tender Documents • 1.98 MB
BOQ_2039876.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid