Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC N A | FARIDABAD | HARYANA | 121004 | 1 | Accepted-AOC L1 bidder awarded the tender after negotiation | |
| 2 | 2₹9.8 L+₹20,126.80 (2.10%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹10.5 L+₹85,895 (8.94%)Rejected-AOC VILLAGE BAGGA PO SIANJ TEHSIL CHACHYOT DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | 3 | Rejected-AOC L3 |
Tender Value
₹7.3 L
EMD Value
₹18,140
Closing Date
1 Jan 2024, 5:00 pmClosed
Commissioner
MC Solan
Channelization of nallah from Jonaji road to Aggarwal house in ward no.9 Solan
2023_UDDHP_83085_1
10553-54 dt. 18.12.23
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Commissioner
₹18,140
26 Dec 2024
22 Dec 2023
2 Jan 2024
22 Dec 2023
1 Jan 2024
22 Dec 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Vivek Dobhal
SOM DUTT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .