| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 CrAdmitted-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | L1 | Admitted-Finance | |
| 2 | L2₹27.0 Cr+₹35.2 L (1.32%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹27.0 Cr+₹36.7 L (1.38%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical DUMKA | - | Rejected-Technical Non Responsive | |
| 5 | Rejected-Technical KACHAHRI ROAD BHAISASUR BIHARSHARIF NALANDA | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | SATISH KUMAR L1 | PREETI CONSTRUCTION & DEVELOPERS PVT LTD L2 | H N CHOUDHARY CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.) SOR - 2.03 (i) A | 8.19 | Hec. | 92,435.08 ₹7,57,043.31 Lowest | 93,800 ₹7,68,222 | 93,809.47 ₹7,68,299.56 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mm SOR - 2.01 (A+B) (i) | 22 | NO. | 640.64 ₹14,094.08 Lowest | 650 ₹14,300 | 649.46 ₹14,288.12 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 600 mm to 900 mm SOR - 2.01 (A+B) (i) | 41 | NO. | 967.81 ₹39,680.21 Lowest | 980 ₹40,180 | 981.14 ₹40,226.74 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR - 2.01 (A+B) (iii) | 72 | NO. | 1,500.23 ₹1,08,016.56 Lowest | 1,520 ₹1,09,440 | 1,520.89 ₹1,09,504.08 |
| 5.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR - 2.01 (A+B) (iii) | 14 | NO. | 2,659.69 ₹37,235.66 Lowest | 2,695 ₹37,730 | 2,696.32 ₹37,748.48 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR - 2.04 (II) B | 70.31 | cu.m | 927.45 ₹65,209.01 Lowest | 940 ₹66,091.4 | 940.22 ₹66,106.87 |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR - 2.04 (III) B | 971.25 | cu.m | 299.36 ₹2,90,753.4 Lowest | 300 ₹2,91,375 | 303.48 ₹2,94,754.95 |
| 8.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately SOR - 2.05 II (A) | 297.45 | cu.m | 244.67 ₹72,777.09 Lowest | 248 ₹73,767.6 | 248.04 ₹73,779.5 |
| 9.00 | Removal of Telephone / Electric Poles and Lines (Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately) SOR - 2.14 | 72 | NO. | 193.54 ₹13,934.88 Lowest | 196 ₹14,112 | 196.21 ₹14,127.12 |
| 10.00 | Removal of Hand pumps including excavation and dismantling of foundation concrete and lines under the supervision of concerned department,disposal with all lifts and up t a lead of 1000 m do all complete SOR - | 1 | NO. | 3,136.8 ₹3,136.8 Lowest | 3,180 ₹3,180 | 3,180 ₹3,180 |
Tender Value
₹25.5 Cr
EMD Value
₹25.5 L
Closing Date
9 Mar 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
Widening, Strengthening and Reconstruction of Road from Karmatand (PWD Road) to Bhogtandih (PWD Road) (Total Length-7.775 Km) under Road Division Dumka for the year 2025-26.
2026_CECOM_110206_1
RCD/DUMKA/26
Open Tender
Civil Works
Item Rate
210 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹25.5 L
CE COMM RCD JHARKHAND RANCHI
10 Apr 2026
11 Feb 2026
10 Mar 2026
11 Feb 2026
9 Mar 2026
17 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.) SOR - 2.03 (i) A | 8.19 | Hec. | - | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mm SOR - 2.01 (A+B) (i) | 22 | NO. | - | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 600 mm to 900 mm SOR - 2.01 (A+B) (i) | 41 | NO. | - | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR - 2.01 (A+B) (iii) | 72 | NO. | - | - |
| 5 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(iii) Girth from 900 mm to 1800 mm SOR - 2.01 (A+B) (iii) | 14 | NO. | - | - |
| 6 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR - 2.04 (II) B | 70.31 | cu.m | - | - |
| 7 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres) ii) (A) Dismantling Brick / Tile work in cement mortar SOR - 2.04 (III) B | 971.25 | cu.m | - | - |
| 8 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately SOR - 2.05 II (A) | 297.45 | cu.m | - | - |
| 9 | Removal of Telephone / Electric Poles and Lines (Removal of telephone/ Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department , disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately) SOR - 2.14 | 72 | NO. | - | - |
| 10 | Removal of Hand pumps including excavation and dismantling of foundation concrete and lines under the supervision of concerned department,disposal with all lifts and up t a lead of 1000 m do all complete SOR - | 1 | NO. | - | - |
stage.html
html • 0.04 MB
technical_148998.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
SBD.pdf
Tender Documents • 5.20 MB
BOQ_148998.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .