Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance AT HARIPUR PO KHADIANGA P S BADACHANA DIST JAJPUR | JAJPUR | ODISHA | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.7 L
EMD Value
₹6,700
Closing Date
20 May 2026, 5:00 pmClosed
Executive Engineer, CD-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of CC Road at Brundabati Lane at Malgodown in Ward No.38
2026_ORULB_128798_4
MC(CMC)CTC_Div-IINo6/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹6,700
Yes
25 May 2026
12 May 2026
25 May 2026
12 May 2026
20 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead | 26.12 | Cum | 858.6 | ₹22,426.63 |
| 2 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. | 33.64 | Cum | 612.7 | ₹20,611.23 |
| 3 | Providing cement concrete for unreinforced cement concrete works of proportion (1:4:8) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for days complete as per specification drawing and direction of the Engineer-in-charge. | 33.64 | Cum | 6,003.7 | ₹2,01,964.47 |
| 4 | providing & laying cement concrete of prop (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc as required for the work complete and as per direction of Engineer in charge. | 50.46 | Cum | 8,041.7 | ₹4,05,784.18 |
| 5 | Supplying, fitting & fixing of Bitumenous expnasion joint board (ISI) including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc | 6.3 | Sqm | 736 | ₹4,636.8 |
| 6 | Remove excavate and dismanteled materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge. | 26.1 | Sqm | 278.77 | ₹7,275.9 |
| 7 | Displayboard | 1 | No | 6,737.56 | ₹6,737.56 |
stage.html
html • 0.04 MB
finance_590972.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_590972.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .