Tender Value
₹9.4 L
EMD Value
₹10,000
Closing Date
9 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Office Thiruporur
Block Development Office Thiruporur
Repairng the Rural Library Building in 5nos village panchayat in Thiruporur Panchayat union in Chengalpattu District
2022_RDTN_220846_1
RC No 167/2022/B2/20.12022
Open Tender
Civil Works - Buildings
Item Rate
60 days
Thiruporur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹10,000
Yes
Block Development Office Thiruporur
9 Feb 2022
26 Jan 2022
9 Feb 2022
26 Jan 2022
9 Feb 2022
26 Jan 2022
28 Jan 2022
60 days
Amount
REPAIRING THE RURAL LIBRARY BUILDINGS IN No. 5 VILLAGE PANCHAYATS ( MADAYATHUR, MELAIYUR, MULLIPAKKAM, ORAGADAM, PERIYAIRUMBEDU) IN THIRUPORUR PANCHAYAT UNION IN CHENGALPATTU DISTRICT having Package No . 2/2021 - 2022
Repairs to Library Building at Madayathur panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
Filling with river sand including cost and conveyance and all other labour charges etc.complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Brick Work in CM1:5 using Country brick including cost and conveyance and all other labour charges etc.complete.
Finishing the roof top with one course of pressed tiles of size 20x2cm laid in cm 1:3 12mm thick including pointing and all other labour charges etc., complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Plastering with cm 1:5 mix, 12mm thick including to all other labour charges etc., complete.
Supply and fixing of 1200mm (48") sweep A.C Ceiling fan complete with regulator with 300mm down rod on existing clamp
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
Colour Washing in two coats with best quality of Oil bound Distember Paint including cost and conveyance and all other labour charges etc, Complete
Colour Washing in two coats with best quality of Emulsion Paint including cost and conveyance and all other labour charges etc, Complete
Painting two coats over old Iron works with approved colour including cost and conveyance and all other labour charges etc complete.
Construction of Toilet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(TOILET)
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed(TOILET)
Supplying and Filling basement with filling Earth in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers (TOILET)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Granolithick floor finishing with cm 1:2:4 mix using 10-12mm ISS metal 25mm thick including all labour charges
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
OBD Paint Finish two coats using best quality Distemper in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Emulsion Paint Finish two coats using best best emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supply & Cost of Steel doors & Windows including cost & Conveyance of materials to site ,etc complete
Repairs to Library Building at Melaiyur panchayat
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Brick Work in CM1:5 using Country brick including cost and conveyance and all other labour charges etc.complete.
Dismantling damaged existing Cement flooring including all charges etc.
Dismantling damaged existing Cement flooring including all charges etc.
Finishing the roof top with one course of pressed tiles of size 20x2cm laid in cm 1:3 12mm thick including pointing and all other labour charges etc., complete
Pointing with CM1:3 including all charges etc.
Paving the Floor with Scratch Proof Ceramic tiles including to all other labour charges etc., complete.
Plastering with cm 1:5 mix, 12mm thick including to all other labour charges etc., complete.
Supply and fixing of single box type 4'40W flou.fitting complete with tube copper choke and condenser with conduit pipe suspension from the ceiling with PVC unsheated leads from terminal to the fitting (S.D.1.60)
Supply and fixing of CFL fitting complete from the ceiling with PVC unsheated leads from terminal to the fitting
Supply and fixing of bulk head fitting
Supply and fixing of 1200mm (48") sweep A.C Ceiling fan complete with regulator with 300mm down rod on existing clamp
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
Colour Washing in two coats with best quality of Oil bound Distember Paint including cost and conveyance and all other labour charges etc, Complete
Colour Washing in two coats with best quality of Emulsion Paint including cost and conveyance and all other labour charges etc, Complete
Painting two coats over old Iron works with approved colour including cost and conveyance and all other labour charges etc complete.
Construction of Toilet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(TOILET)
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed(TOILET)
Supplying and Filling basement with filling Earth in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers (TOILET)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Granolithick floor finishing with cm 1:2:4 mix using 10-12mm ISS metal 25mm thick including all labour charges
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
OBD Paint Finish two coats using best quality Distemper in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Emulsion Paint Finish two coats using best best emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supply & Cost of Steel doors & Windows including cost & Conveyance of materials to site ,etc complete
Repairs to Library Building at Mullipakkam panchayat
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Brick Work in CM1:5 using Country brick including cost and conveyance and all other labour charges etc.complete.
Supply and Fixing of new Steel window including all charges etc.
Finishing the roof top with one course of pressed tiles of size 20x2cm laid in cm 1:3 12mm thick including pointing and all other labour charges etc., complete
Paving the Floor with Scratch Proof Ceramic tiles including to all other labour charges etc., complete.
Plastering with cm 1:5 mix, 12mm thick including to all other labour charges etc., complete.
Supply and fixing of single box type 4'40W flou.fitting complete with tube copper choke and condenser with conduit pipe suspension from the ceiling with PVC unsheated leads from terminal to the fitting (S.D.1.60)
Supply and fixing of CFL fitting complete from the ceiling with PVC unsheated leads from terminal to the fitting
Supply and fixing of bulk head fitting
Supply and fixing of 1200mm (48") sweep A.C Ceiling fan complete with regulator with 300mm down rod on existing clamp
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
Colour Washing in two coats with best quality of Oil bound Distember Paint including cost and conveyance and all other labour charges etc, Complete
Colour Washing in two coats with best quality of Emulsion Paint including cost and conveyance and all other labour charges etc, Complete
Painting two coats over old Iron works with approved colour including cost and conveyance and all other labour charges etc complete.
Construction of Toilet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(TOILET)
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed(TOILET)
Supplying and Filling basement with filling Earth in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers (TOILET)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Granolithick floor finishing with cm 1:2:4 mix using 10-12mm ISS metal 25mm thick including all labour charges
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
OBD Paint Finish two coats using best quality Distemper in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Emulsion Paint Finish two coats using best best emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supply & Cost of Steel doors & Windows including cost & Conveyance of materials to site ,etc complete
Repairs to Library Building at Oragadam panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
Filling with river sand including cost and conveyance and all other labour charges etc.complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Brick Work in CM1:5 using Country brick including cost and conveyance and all other labour charges etc.complete.
Finishing the roof top with one course of pressed tiles of size 20x2cm laid in cm 1:3 12mm thick including pointing and all other labour charges etc., complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Plastering with cm 1:5 mix, 12mm thick including to all other labour charges etc., complete.
Supply and fixing of single box type 4'40W flou.fitting complete with tube copper choke and condenser with conduit pipe suspension from the ceiling with PVC unsheated leads from terminal to the fitting (S.D.1.60)
Supply and fixing of CFL fitting complete from the ceiling with PVC unsheated leads from terminal to the fitting
Supply and fixing of bulk head fitting
Supply and fixing of 1200mm (48") sweep A.C Ceiling fan complete with regulator with 300mm down rod on existing clamp
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
Colour Washing in two coats with best quality of Oil bound Distember Paint including cost and conveyance and all other labour charges etc, Complete
Colour Washing in two coats with best quality of Emulsion Paint including cost and conveyance and all other labour charges etc, Complete
Painting two coats over old Iron works with approved colour including cost and conveyance and all other labour charges etc complete.
Construction of Toilet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(TOILET)
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed(TOILET)
Supplying and Filling basement with filling Earth in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers (TOILET)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Granolithick floor finishing with cm 1:2:4 mix using 10-12mm ISS metal 25mm thick including all labour charges
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
OBD Paint Finish two coats using best quality Distemper in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Emulsion Paint Finish two coats using best best emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supply & Cost of Steel doors & Windows including cost & Conveyance of materials to site ,etc complete
Repairs to Library Building at Periyairumbedu panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per ss20B etc.Complete.
Filling with river sand including cost and conveyance and all other labour charges etc.complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc.complete.
Brick Work in CM1:5 using Country brick including cost and conveyance and all other labour charges etc.complete.
Supply and Fixing of Cuddapha Slab including all charges etc.
Dismantling te damaged Plastering Outer Wall etc.
Finishing the roof top with one course of pressed tiles of size 20x2cm laid in cm 1:3 12mm thick including pointing and all other labour charges etc., complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Paving the Floor with Scratch Proof Ceramic tiles including to all other labour charges etc., complete.
Plastering with cm 1:5 mix, 12mm thick including to all other labour charges etc., complete.
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
Colour Washing in two coats with best quality of Oil bound Distember Paint including cost and conveyance and all other labour charges etc, Complete
Colour Washing in two coats with best quality of Emulsion Paint including cost and conveyance and all other labour charges etc, Complete
Painting two coats over old Iron works with approved colour including cost and conveyance and all other labour charges etc complete.
Construction of Toilet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(TOILET)
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed(TOILET)
Supplying and Filling basement with filling Earth in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.(TOILET)
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers (TOILET)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate).
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing Granolithick floor finishing with cm 1:2:4 mix using 10-12mm ISS metal 25mm thick including all labour charges
White washing in two coats with best freshly burnt white shell lime including cost and conveyance and all other labour charges etc complete.
OBD Paint Finish two coats using best quality Distemper in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Emulsion Paint Finish two coats using best best emulsion in all the floors using best quality & approved variety of colouring pigments including cost of Materials & scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Supply & Cost of Steel doors & Windows including cost & Conveyance of materials to site ,etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G.M.S.CONSTRUCTION
stage.html
html • 0.02 MB
finance_261113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .