Loading…
Loading…
Tender Value
₹18.6 L
EMD Value
₹37,500
Closing Date
20 Jul 2026, 3:00 pmClosed
EXECUTIVE ENGINEER,
ELECTRICAL DIV PWD B AND R AMRITSAR
Improvement of 5-way typical multi arm Junction Umarpura Chowk with android Police Control App at Batala Distt Gurdaspur
2026_CEPW_171562_1
12/2026-27 03-07-2026
Open Tender
Electrical Works
Percentage
BATALA
Please Refer Tender Documents
8 documents required · 8 mandatory
₹5,000
₹37,500
Yes
16 Sept 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DOUBLE WALLED CORRUGATED (DWC) HDPE PIPES: Supply and erection of Double Walled Corrugated (DWC) HDPE pipe to be laid 1mtr. below ground level including excavation placing the pipe in position and back filling with excavated soil etc. of the required size:- | |||||
| 1.01 | Double Walled Corrugated HDPE Pipe 63/51mm (Outer/ Inner dia.) | - | Metre | 155.92 | - |
| 2Supply & Erection of Intelligent Adaptive APP Based Traffic Management System. Equipped with New tec- 520 next generation technologies with following Features. “One City One App Programming Module“ Related to SMD based Technology Traffic Controlsystems) Note:- Free Application APP Provided by the company including Free Training to Traffic Police for operations on Junction for Priority including free updating for 10 Years . • POLICE CONTROL APP WITH FREE NETWORK NEED NO INTERNET/NETWORK FOR OPERATION. WORKING IN 1200 MTR RANGE. • Working on User Friendly . • GPS Enables GREEN WAVE CORRIDOR ACTIVATION OPERATION WITHOUT SERVER APPLICATION. • FAULT RECORD ONLINE CHECK GLOBAL HARWARE SETTING CompactNextGenerationHardware&Userfriendly GPRS enabledSystems, Advance Voltage Control with software-based systems including three phase power Cross detections/spikes proofsystems. Pre-timed, Vehicle Actuated, Manual Control, Hurry Call, Cable less linking and Flash modes of operation. 1) 2*48work periods for work day and holiday setting; 2) Easy for maintenance and function extension by modular design; 3) InputAC220V, 4) Yellowflashing or power of fat night can be set 5) Adopt RS-232 or LAN port to communicate with upper computer; 6) working menus used for any period among 1~30 numbers customs can set it by choice); 7) Theflashingstate,frequencyandtimeofeachgreen signal light can be set or adjusted; 8) It can modify the current pace of running time in the running state immediately; 9) Fullred, yellow flashing,step by step manual jumpin the manual remote manual function optional); 10) Be equipped with the hardware fault testing function Red Light fails, Green light suptest), downgrade toYellow flash status and cut down the Red & Green light power supply when the fault happens.(Optional) | |||||
| 2.01 | 11) The output part adopts zero-test technology Change of state is under zero state switch in communication Make the drive more safe and reliable;
12) Each output all the way within dependent lightning protection circuit;13) Equipped with Installation testing capabilities and it can be used to test if each light is correctly installed.
30 menus can be used for backup and recovery 15)The setup software can operate offline Project data can be stored on the computer
Also working with Android working APP Green Wave traffic signal technology.
Special menu:- detector failure menu, Amber Flashing menu,total fault detection menu enables with DIP setup functions.
Free Software connected through non web applicationsNote:-NOPLC Based /GSM/ Sim/ Bluetooth System Accepted.
Mandatory :-Modules have WPC Certifications Certified) Certifications from Government of INDIA
14) IEC61347-2-13:2024 Certifications Certified. | - | Each | 3,95,824 | - |
| 3 | Supply & erection of Anti theft Cabinet with heavy duty M.S Sheet without any Hinges with Internal lockingbolts Without door ,but lockable roof with nut bolt including base frame made with heavy duty angle stand suitable for Battery Bank & Charge Controller complete in all respects of the same with connection , testing etc, complete in all respect as desired by the Engineer-in-charge | - | Each | 23,368 | - |
| 4 | Supply & Erection of LED aspects as per Following specifications & Standards:- Polycarbonate signal aspects of impact resistance, UV stabilized, Fast dyed, Unbreakable, rust & rain proof & anticorrosive IP-65 Certified, no metallic components parts used single walled including aluminum basket for led,s retro fit kit with brassnb ,text uren on reflective from surface ,hdpe detachable sun visors and LED’s based lamp from giving balanced light output intensity with tolerable limit and with appropriate colors & necessary mounting arrangements .a) RED/Amber Led,s Signal Aspect 12Led’s Viewing angle-23deg. Led,sForwardcurrent-20ma Total no of Led’s -190no. Total consumption-10Wmax. IntensityofLed aspect-260cd minimum Energy consumption upto 8.5 watt TUV/EN/IP Tested & Certified, | - | Each | 7,773 | - |
| 5 | Supply & Erection of LED aspects as per Followingspecifications & Standards:- Polycarbonate signal aspects of impact resistance, UV stabilized, Fast dyed, Unbreakable, rust & rain proof & anticorrosive IP-65 Certified, no metallic components parts used single walled including aluminum basket for led,s retro fit kit with brass nb,text urenon reflective from surface ,hdpe detachable sun visors and LED’s based lamp from giving balanced light output intensity with tolerable limit and with appropriate colors & necessary mounting arrangements.b) Green Colour LEDs Signal AspectLed’s Viewing angle -23deg. Led,s Forward current-10ma Total no of Led’s -66no. Total consumption-4Wmax. Intensity of Led aspect-260cd minimum Energy consumption up to 6 watt. TUV/EN/IPTested&Certified QUALITY ASSURENCE TUV Certified,CE, P65 tested approved ,EN/BIS Certified as per MORTH/IRC Guidelines | - | Each | 8,155 | - |
| 6 | Supply & erection of 8 pole (twin Junction) Controller synchronized digital power wave out-put (5V operation programme ddigital form) for priority based better flow of traffic connected with App controldeviceSystems for Command of Main Control &inhance the WIFI Coverage Area to operate the applications at any corner of junctions in Built PWM & auto Cut on High/low Voltage ,Heat protections uitable for fast command signal operation.completely suitable for 15 Channels,,(sequence Enhancer of signal strength of WIFI range ) | - | Each | 97,287 | - |
| 7 | Supply & erection of Cantilever poles: - This signal post consists of 3 sections 5”/4”/3/2” dia made from mild steel B class pipes .The tubes are joined by tempering outer tube signal post is capable of Holding vehicular as well as pedestal faces the overhang assembly is provided for minimum clearance of polefrom G/L Total height of Polevaries from 8.3mtr.Pole is further Divided in two sections and is joined with the help of flanges for easy transportation including required RCC in Foundation. size of Cantilever bracket upto 15 feet long & one segments ection in half of Bracket Designed as per International Traffic rules & Standards.) | - | Each | 28,137 | - |
| 8 | Supply & erection of Turner type Black sheathed PP14 core control cable 1mm copper Polypropylene super cable with full sheathed as per site requirement. | - | Each | 377 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.56 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 29.10 MB
BOQ_348988.xls
BOQ • 0.30 MB
5way.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .