Tender Value
₹1.4 L
EMD Value
₹2,773
Closing Date
27 Apr 2026, 3:00 pmClosed
Executive Engineer
WD.II, DDW, PORVORIM GOA
Strengthening/ providing supports to the 600mm conveying main leading from MBR to Nagzar village of Pernem constituency in Pernem Taluka.
2026_DDW_28800_1
DDW/ WD.II/ ASW/ F.24-E/ 04/ 2026-27/ L-2
Open Tender
Pipe Laying Works
Percentage
90 days
Pernem
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,000
₹2,773
30 Jul 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavation )/manual means in foundation pipelines trenches in all types of soft stratas comprising any of the materials such as soil ,silt, sand, clay ,gravels, moorum of all varietie, shingles .pebbles all types of conglomerates , laterite rocks ,ordinary rocks , weathered rocks and all such other materials as described under appendix A to these specification either in full or in parts as the case may be adopting any method as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry ,moist , foul saturated submerged etc. and as directed by the Engineer-in-charge etc. all complete in foundation pipeline trenches including dressing of sides, ramming of bottoms including getting out the excavated soil and disposal of surplus soil for all lead and all lifts including barricading, danger lighting guarding as per direction of Engineer-in-charge . | - | Cu.m. | 1 | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | - | Cu.m. | - | - |
| 3 | Centering and shuttering including struttings propping etc. and removal of formwork for :;Foundations footings bases for columns and mass concrete. | - | Sq.m | - | - |
| 4 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;In retaining walls return walls(any thk) including attached pilasters columns piers abutments pillars posts struts buttresses string or lacing courses parapets coping bed blocks anchor blocks plain window sills fillets etc upto floor five level. | - | Cu.m. | - | - |
| 5 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering shuttering and finishing in:;All works upto plinth level | - | Cu.m. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 0.42 MB
Tendernotice_3.pdf
PDF • 0.63 MB
BOQ_29239.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .