| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | ₹4.0 L | L1 | Accepted-Finance L1 |
| 2 | Rejected-Technical 39 288 THANGAMAPURI PATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | SARVESWARASAMY AND CO L1 |
|---|---|---|---|---|
| 1.00 | Complete overhauling of LT unit Bus (USSG-4A & 4B) for Swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the Modules (138 Nos). (For 1 No. USSG LT bus) | 2 | Nos | 10,750 ₹21,500 |
| 2.00 | Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable. | 2 | Nos | 26,500 ₹53,000 |
| 3.00 | Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breakers, checking & cleaning of Finger contacts, healthiness of spring charging motors and the mechanisms, termination tightness of all components of Breakers and checking their operations and refixing the modules and Breakers in the respective panels. | 2 | Nos | 22,800 ₹45,600 |
| 4.00 | Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning. | 2 | Nos | 11,700 ₹23,400 |
| 5.00 | Complete overhauling of LT station Bus (SSSG-4) for Swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the Modules (78 Nos). (For 1 No. SSSG LT bus) | 1 | Nos | 7,000 ₹7,000 |
| 6.00 | Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable and reinsulating / termination Wherever necessary. | 1 | Nos | 18,600 ₹18,600 |
| 7.00 | Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breaker checking & cleaning of Finger contacts, healthiness of spring charging motor and mechanism, termination tightness of all components in the Breakers and checking its operations and refixing the modules and Breakers in the respective panels. | 1 | Nos | 15,800 ₹15,800 |
| 8.00 | Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning. | 1 | Nos | 7,000 ₹7,000 |
| 9.00 | Complete overhauling of LT Bus VMCC 4A & 4B for swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules (Total 92 Nos).(for VMCC A & B bus) | 1 | Nos | 7,900 ₹7,900 |
| 10.00 | Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable. | 1 | Nos | 18,700 ₹18,700 |
Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
2 Mar 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I SD IV Cleaning , complete overhaul and checking of IR value of all the 9 Nos LT buses during the capital overhaul of Unit-IV in 2026
2026_EB_658503_1
CE-MTPSI-SE-ES-EMI-OT146-25-26
Open Tender
Electrical Works
45 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
₹3,400
Yes
13 May 2026
16 Feb 2026
3 Mar 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
Complete overhauling of LT unit Bus (USSG-4A & 4B) for Swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the Modules (138 Nos). (For 1 No. USSG LT bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable.
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breakers, checking & cleaning of Finger contacts, healthiness of spring charging motors and the mechanisms, termination tightness of all components of Breakers and checking their operations and refixing the modules and Breakers in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Complete overhauling of LT station Bus (SSSG-4) for Swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the Modules (78 Nos). (For 1 No. SSSG LT bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable and reinsulating / termination Wherever necessary.
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breaker checking & cleaning of Finger contacts, healthiness of spring charging motor and mechanism, termination tightness of all components in the Breakers and checking its operations and refixing the modules and Breakers in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Complete overhauling of LT Bus VMCC 4A & 4B for swgr. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules (Total 92 Nos).(for VMCC A & B bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable.
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and refixing the modules in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Complete overhauling of LT Bus BMCC-4A & 4B .Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules ( A-59 &B-58,Totally 117 Nos). (for BMCC A & B LT bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable.
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breakerchecking & cleaning of Finger contacts, healthiness of spring charging motor, termination tightness of all components and checking Breaker operations and refixingthe modules and Breakers in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Complete overhauling of LT Bus SBMCC. Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules (89 modules). (For 1 No. SBMCC LT bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable .
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and checking /refixing the modules in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Complete overhauling of LT Bus N/E -4 Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules (94 Nos). (For 1 No. N/E LT bus)
Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Bus bar joints, cleaning the entire area and checking the tightness of outgoing cable.
Cleaning of all the modules, cleaning & healthiness checking of Power Contactor tips and replacing if necessary, termination tightness of all components, cleaning the sliding contacts with IPA and in Breakerchecking & cleaning of Finger contacts, termination tightness of all components and checking Breaker operations and refixing the modules and Breakers in the respective panels.
Refixing the Top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
i) Acetone
ii) CRC 500 ml
consumables
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_790010.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid