Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.6 L+₹2,604.44 (1.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
7 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O R/WALL ON IRIGATION CANAL NEAR H/O AB RASHID AND MUSHTAQ AHMAD SHEIKH
2026_RDPR_317679_24
NIT29
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,200
15 Aug 2026
24 Jul 2026
8 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations, layers ≤20 cm, ramming & watering, lead 50m, lift 1.5m. | 27.61 | cum | 272.1 | ₹7,512.68 |
| - | Earthwork excavation by mechanical means (hydraulic excavator), trenches ≤1.5m width, ≤10 sqm plan, dressing sides, ramming bottoms, disposal of surplus earth within 50m lead, all kinds of soil (allowed 25 cum). | 25 | cum | 252.15 | ₹6,303.75 |
| - | Demolishing stone rubble RR masonry in cement mortar, stacking serviceable material, disposal of unserviceable material within 50m lead (allowed 10%). | 0.87 | cum | 1,740.45 | ₹1,521.15 |
| - | Demolishing stone rubble dry RR masonry, stacking serviceable material, disposal within 50m lead (allowed 90%). | 7.86 | cum | 200 | ₹1,572.6 |
| - | Dry random rubble masonry with hard stone in foundation & plinth, with bond stone, quarry stone. Net qty after demolition deduction. | 29.99 | cum | 5,536.55 | ₹1,66,018.99 |
| - | Dry random rubble masonry with hard stone in foundation & plinth, with bond stone, using stones available at site (demolition qty reused). | 8.74 | cum | 2,000 | ₹17,474 |
| - | Pointing on stone work with cement mortar 1:4 (flush/ruled pointing). | 134.69 | sqm | 191.7 | ₹25,820.07 |
| - | Cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate, 20mm size), curing, excluding centering/shuttering, up to plinth level. | 2.76 | cum | 5,733.6 | ₹15,824.74 |
| - | Mechanical carriage of quarry stones, loading/unloading/stacking, lead 7 km (calculated @125% of demolition qty). | 37.48 | cum | 464.14 | ₹17,395.97 |
| - | Provision for sign board & photographs (pre-execution, during execution, post-completion). | 1 | job | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1042565.xls
BOQ • 0.24 MB
corrigendum.pdf
PDF • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .