Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.7 LAccepted-AOC DOOR NO 341 SURAMANGALAM MAIN ROAD SOUTH LINE 3 ROAD PALLAPATTI TOWN SALEM 636009 | SALEM | TAMIL NADU | 636009 | ₹58.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹59.6 LRejected-AOC 1 93 CHINNA NADUPATTY CHIKKANAMPATTY POST OMALUR TK SALEM DT 636345 | 636345 | ₹59.6 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical 1 77 CHINNANADUPATTI SIKKANNAMPATTY OMALUR SALEM 636455 | SALEM | SALEM | TAMIL NADU | 636455 | - | - | Rejected-Technical Original Affidavit Not Submitted, Hence Rejected |
| Sl No | Description | Qty | Unit | V Thangaraj and Co L1 | Sri Sowntharya & Co L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the Road from Vilampatty Prllathu Odai Palam to Mohan House Via Mothjiram Kuttai Km 0/0-1/280 H/O Anuppur | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 460.8 | Sqm | 3 ₹1,382.40 | 7 ₹3,225.60 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction. KM 0/0-1/1280. | 115.2 | Qum | 240 ₹27,648 | 350 ₹40,320 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-1/1280. | 720.19 | Qum | 2,435 ₹17.5 L | 2,450 ₹17.6 L |
| 5.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-1/1280. | 4,801.25 | Sqm | 86 ₹4.1 L | 87 ₹4.2 L |
| 6.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-1/1280. | 4,801.25 | Sqm | 20 ₹96,025 | 21 ₹1.0 L |
| 7.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the.KM 0/0-1/1280. | 120.03 | Sqm | 11,280 ₹13.5 L | 11,500 ₹13.8 L |
| 8.00 | Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Inclu | 79.32 | Sqm | 250 ₹19,830 | 270 ₹21,416.40 |
| 9.00 | Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the | 15.86 | Qum | 5,300 ₹84,058 | 5,400 ₹85,644 |
| 10.00 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes | 267.75 | Qum | 530 ₹1.4 L | 550 ₹1.5 L |
Updated dates
Tender Value
₹63.0 L
EMD Value
₹64,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Joint Director/Project Director
DRDA,Salem
Salem District - Ayothiyapattinam Block - Strengthening and Five Year Maintenance of the Road from Vilampatty Prllathu Odai Palam to Mohan House via Mothiram Kuttai in NABARD - RIDF- 2026-2027 Package No.18
2026_RDTN_656804_22
Roc.No.875/2026/A3
Open Tender
Civil Works - Roads
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹64,000
DRDA,Salem
29 May 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
16 Feb 2026
Strengthening the Road from Vilampatty Prllathu Odai Palam to Mohan House Via Mothjiram Kuttai Km 0/0-1/280 H/O Anuppur
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction. KM 0/0-1/1280.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-1/1280.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-1/1280.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-1/1280.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the.KM 0/0-1/1280.
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Inclu
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the
Provision for Sign Board - Nos
Provision for Hecta Metre Stone - Nos
Provision for KM Stone - Nos
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
18.pdf
Tender Documents • 1.47 MB
BOQ_788564.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid