Loading…
Loading…
Tender Value
₹9.1 L
EMD Value
₹18,140
Closing Date
8 Jun 2026, 12:00 pm2d left
EE
VIKAS BHAWAN VARANASI
Pardampuri Colony Nikat Nawab Ganj Durgakund me Shri Nawal Kishor ke Makan se Lekar Shri Saurabh Pathak Karpatri Smriti ke Mukhya dwar tak Jal Nikasi wa Sadak Nirman karya.
2026_REDUP_1146167_1
08 DATE 02-04-2026
Open Tender
Civil Works
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,140
Yes
8 May 2026
8 May 2026
8 Jun 2026
8 May 2026
8 Jun 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 2 | Concrete with 4cm. Gauge stone ballast, approved coarse sand and cement in proportion of 1:6:12 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work S.I. No-281 | 1 | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 3 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | 12 mm thick cement plasterin 1:4 cement morter I/C all material labour T&P proper complition to the work . S.I. No-584 | 1 | sqm | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 6 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 0.2 | cum | 1 | ₹0.2 | BI01010001010000000000000515BI0100001119 |
| 7 | Construction of K.C. drain with precast of C.C. Blocks size (400x325 mm) laid in flat position (37.5 mm in length )and kerb stone (300mm in length)including cost of Base Concrete in 1:6:12 cement sand and O.B.B Including cost of all material labour T&P etc,proper complition to the work . as per S.E.RED VNS Estimate no 01 dt- 22.08.2015 | - | rm | 1 | - | BI01010001010000000000000515BI0100001120 |
| 8 | SRRC Pree Cost Chamber Cover With pree cost RCC Cover Including all complete. | - | nos | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | SRRC Pree Cost Gali Pit With pree cost RCC Cover Including all complete. | - | nos | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | S/Fixing of infomatary M.S sign board Size (1.2x0.90) Made of 18 mm gauge M.S.Sheet fixed in ISA 40x40x5 mm frame supported in back side by 40x5 mm fiat iron on all four side along with two vertical pont of 2.15 mt from bottom of frame of angle iron ISA 40X40X5 mm with 150 mm long horizontal lag at bottom braded with 40x5 mm flat iron ellectrically welded and pointed with one coat red oxide primer S.S. NO. 503 | - | nos | - | - | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
sbd.pdf
Tender Documents • 1.33 MB
BOQ_2143313.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid